Uttara Center metro station

Uttara Center Metro Station is a metro rail station under construction by the Dhaka Metro Railway. This station is located in Uttara, a suburb of Dhaka. It is estimated that the station will be inaugurated in December 2022[1] to run metro rail. The station belongs to MRT Line 6.[2]

Uttara Center

উত্তরা মধ্য
Station of Dhaka Metro Rail
General information
Other namesStation 2
LocationAvenue 1, Sector 15, Uttara, Dhaka
Bangladesh
Owned byDhaka Mass Rapid Transit Company Ltd.
Line(s)Line 6
PlatformsSide platform
Tracks2
Construction
Structure typeRaised
Platform levels4
Bicycle facilitiesno
History
Opening2022
Services
Preceding station   Dhaka Metro Rail   Following station
Uttara North   Line 6   Uttara South
Location

History

The Uttara Center metro station was constructed under "Package CP-03". The notification of application for construction of raised bridges for stations and railways was published on June 30, 2015 and the last date for submission of applications was September 9, 2015. Italian-Thai Development Public Company Limited gets work contract for "Package CP-03". The agreement document was sent to Mantra on March 29, 2016 for NBR investigation and law and parliamentary investigation. The signing ceremony for the agreement package was held on May 3, 2017 at the Pan Pacific Sonargaon Hotel in Dhaka. Construction work started on August 2, 2017.[3][4]

Transit Oriented Development Hub

According to the plan, commercial establishments will be opened at the every station of Line-6 under construction from Uttara to Motijheel. This method of opening a commercial enterprise is called Transit Oriented Development (TOD) Hub. Then TOD hub will be made in one or more places in each line. Each metrorail station will be multi-storey. If there is not enough land near the station, there are plans to set up commercial shops in the station plaza. According to the plan, the first TOD hub will be around Uttara Center metro station. For this, 28.62 acres of land has been purchased from the RAJUK. RAJUK has already been given around Tk 866 crore as land value from the Metrorail construction project. The NKDM Association, led by Nippon Koei, a consulting firm for Metrorail Line-6, will design the construction of the TOD hub, prepare development project proposals and prepare all the plans including tender documents.[5]

Station

Station layout

G Path level Exit / Entry
L1 Between Rent control, station agent, metro card vending machine, crossover
L2 Side platform no. 1, The left door will open
Southbound towards → Uttara South
Northbound towards ←Uttara North← ←
Side platform no. 2, The left door will open
L2

References