Thalaghattapura metro station

Thalaghattapura is a metro station on the Green Line of the Namma Metro.[2][3] This station was opened on 21 January 2021 to the public. The station was inaugurated along with five other stations, as a part of the Green Line extension.[4][5]

Thalaghattapura
Namma Metro station
Namma Metro train at Thalaghattapura metro station either towards Silk Institute (Southbound) or towards Nagasandra (Northbound).
General information
Location15/3, Kanakapura Rd, Paramount Gardens, Talaghattapura, Bengaluru, Karnataka 560062
Coordinates12°52′18″N 77°32′20″E
Owned byNamma Metro
Operated byBangalore Metro Rail Corporation Ltd (BMRCL)
Line(s) Green Line 
PlatformsSide platform
Platform-1 → Nagasandra
Platform-2 → Silk Institute
Tracks2
Construction
Structure typeElevated
Platform levels2
Disabled accessYes
Other information
StatusStaffed
Station codeTGTP
History
Opened21 January 2021 (2021-01-21)[1]
Electrified750 V DC third rail
Services
Preceding station   Namma Metro   Following station
toward Nagasandra
Green Line
Terminus
Location
Thalaghattapura
Location in Bangalore
Thalaghattapura
Location in Karnataka
Thalaghattapura
Location in India

Station layout

G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform No- 2, doors will open on the left
Southbound Towards → Silk Institute
Northbound Towards ← Nagasandra next station is Vajarahalli
Side platform No- 1, doors will open on the left
L2

See also

Thalaghattapura track layout
Station with two tracks and two side platforms

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.