Pasir Ris East MRT station

Pasir Ris East MRT station is a future underground Mass Rapid Transit station on the Cross Island MRT line located in Pasir Ris, Singapore. It will be located along Pasir Ris Drive 1, between Pasir Ris Street 12 and Pasir Ris Street 11.

 CR4 
Pasir Ris East
巴西立东
பாசிர் ரிஸ் ஈஸ்ட்
Future Mass Rapid Transit (MRT) station
General information
Coordinates1°21′58″N 103°57′40″E
Owned byLand Transport Authority
Line(s)
PlatformsIsland
Construction
Structure typeUnderground
Disabled accessYes
History
Opening2030 (2030)
Services
Preceding station Mass Rapid Transit Following station
Loyang Cross Island Line
Future service
Pasir Ris
towards Bright Hill
Location
Pasir Ris East
Pasir Ris East station

History

On 25 January 2019, the Land Transport Authority (LTA) announced that Pasir Ris East station would be part of the proposed Cross Island line (CRL). The station will be constructed as part of Phase 1 (CRL1), consisting of 12 stations between Aviation Park and Bright Hill. CRL1 was expected to be completed in 2029.[1][2][3] However, the restrictions imposed on construction works due to the COVID-19 pandemic led to delays and the CRL1 completion date was pushed by one year to 2030.[4]

The contract for the design and construction of Pasir Ris East Station and associated tunnels was awarded on 7 February 2022 to a joint venture between Singapore Engineering & Construction Pte. Ltd. and Sinohydro Corporation Limited (Singapore Branch) at S$363 million (US$266.1 million). Construction of the station will start in the second quarter of 2022. The works will involve the installation of an earth retaining and stabilising structure and excavation works of up to 25 metres (82 ft) deep.[5] The roads and utilities are to be diverted in stages to facilitate construction works.[6] The surrounding structures, such as the residential blocks, are to be closely monitored for any ground movement.[7]

References

  1. "LTA | News Room | News Releases | Joint News Release by the Land Transport Authority (LTA) & SLA – Cross Island Line 1: New Links by 2029". 5 March 2020. Archived from the original on 5 March 2020. Retrieved 5 March 2020.
  2. Tan, Christopher (5 March 2020). "First phase of Cross Island MRT line finalised; will have 12 stations, Transport News & Top Stories – The Straits Times". The Straits Times. Archived from the original on 25 January 2019. Retrieved 5 March 2020.
  3. "First phase of Cross Island Line to open by 2029 with 12 stations – CNA". Channel NewsAsia. 5 March 2020. Archived from the original on 25 January 2019. Retrieved 5 March 2020.
  4. "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Updates on Thomson East Coast Line, Jurong Region Line and Cross Island Line". Ministry of Transport. Archived from the original on 17 May 2021. Retrieved 17 May 2021.
  5. "LTA Awards Civil Contract for Design and Construction of Pasir Ris East Station under Cross Island Line Phase 1". LTA. 7 February 2022. Retrieved 7 February 2022.
  6. Lee, Nian Tjoe (7 February 2022). "LTA awards $363 million contract for Pasir Ris East Station under Cross Island Line Phase 1". The Straits Times. Retrieved 9 February 2022.
  7. Firdaus Hamzah (7 February 2022). "Construction of Pasir Ris East MRT station on Cross Island Line to start in Q2". CNA. Retrieved 7 February 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.