North–South Corridor (Ahmedabad Metro)

The North-South Corridor of the Ahmedabad Metro is a metro route of the mass rapid transit system in Ahmedabad, India. It consists of 15 metro stations from APMC to Motera Stadium with a total distance of 18.87 km (11.73 mi). The complete line is elevated.

North-South Corridor
Overview
StatusUnder Construction
LocaleAhmedabad
Gandhinagar
TerminiMahatma Mandir
APMC
Stations35
Service
TypeRapid Transit
SystemAhmedabad Metro
Operator(s)Gujarat Metro Rail Corporation Limited
Rolling stockHyundai Rotem
History
Opened2022 (Expected)
Technical
Line length41.36 km
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) (Standard gauge)
Electrification750V DC Third Rail
Route map

km
to North–South Extension Corridor
Motera Stadium
Sabarmati
AEC
Sabarmati Railway Station
Ranip
Vadaj
Vijay Nagar
Usmanpura
Old High Court on East-West Corridor
Gandhigram
Paldi
Shreyas
Rajiv Nagar
Jivraj Park
APMC
Gyaspur Depot

It will connect Motera Stadium to APMC, Vasna and will be passing through Sabarmati, AEC, Sabarmati Railway station, Ranip, Vadaj, Vijaynagar, Usmanpura, Old High court, Gandhigram, Paldi, Shreyas, Rajivnagar and Jivraj stations.[1]

The Government of Gujarat gave approval for Phase-2 of project in October 2017 and revised it in October 2018. In February 2019, the Union cabinet approved the Rs 5384.17 crore second phase of the project. It will extend from Motera to Mahatma Mandir in Gandhinagar (22.838 km) with a separate line from Gujarat National Law University (GNLU) linking Pandit Deendayal Energy University (PDEU) and GIFT City (5.416 km). The Phase-2 will have total 28.254 km long elevated corridor with 22 stations.[2][3][4]

Tendering for the Phase 2 began in January 2020.[5][6] On 18 January 2021, the foundation of the 28.25 km long Phase-2 connecting Ahmedabad with Gandhinagar was laid by Prime Minister Modi.[7] GNLU to GIFT City line is expected to open in early 2024.[8]

List of stations

Following is a list of stations on this route:

North-South Corridor
# Station Name Status Phase Connections Layout
EnglishGujarati
1Mahatma Mandirમહાત્મા મંદિરUnder ConstructionPhase 2NoneElevated
2Sector-24 (Gandhinagar)સેક્ટર-24Under ConstructionPhase 2NoneElevated
3Sector-16 (Gandhinagar)સેક્ટર-16Under ConstructionPhase 2NoneElevated
4Juna Sachivalayaજૂના સચિવાલયUnder ConstructionPhase 2NoneElevated
5Akshardham (Gandhinagar)અક્ષરધામUnder ConstructionPhase 2NoneElevated
6Sachivalaya (Gandhinagar)સચિવાલયUnder ConstructionPhase 2NoneElevated
7Sector-10A (Gandhinagar)સેક્ટર-10એUnder ConstructionPhase 2NoneElevated
8Sector-1 (Gandhinagar)સેક્ટર-1Under ConstructionPhase 2NoneElevated
9Infocityઇન્ફોસિટીUnder ConstructionPhase 2NoneElevated
10Dholakuva Circleધોળાકુવા સર્કલUnder ConstructionPhase 2NoneElevated
11RandesanરાંદેસણUnder ConstructionPhase 2NoneElevated
12RaysanરાયસનUnder ConstructionPhase 2NoneElevated
13GNLUજી એન એલ યુUnder ConstructionPhase 2NoneElevated
14Koba Gamકોબા ગામUnder ConstructionPhase 2NoneElevated
15Juna Kobaજૂના કોબાUnder ConstructionPhase 2NoneElevated
16Koba Circleકોબા સર્કલUnder ConstructionPhase 2NoneElevated
17Narmada Canalનર્મદા કેનાલUnder ConstructionPhase 2NoneElevated
18Tapovan Circleતપોવન સર્કલUnder ConstructionPhase 2NoneElevated
19Vishwakarma Collegeવિશ્વકર્મા કોલેજUnder ConstructionPhase 2NoneElevated
20Koteshwar Roadકોટેશ્વર રોડUnder ConstructionPhase 2NoneElevated
21Motera Stadiumમોટેરા સ્ટેડિયમUnder ConstructionPhase 1NoneElevated
22SabarmatiસાબરમતીUnder ConstructionPhase 1NoneElevated
23AECએ ઇ સીUnder ConstructionPhase 1NoneElevated
24Sabarmati Railway Stationસાબરમતી રેલવે સ્ટેશનUnder ConstructionPhase 1NoneElevated
25RanipરાણીપUnder ConstructionPhase 1NoneElevated
26VadajવાડજUnder ConstructionPhase 1NoneElevated
27Vijay Nagarવિજય નગરUnder ConstructionPhase 1NoneElevated
28Usmanpuraઉસ્માનપુરાUnder ConstructionPhase 1NoneElevated
29Old High Courtજૂની હાઇ કોર્ટUnder ConstructionPhase 1 East-West Corridor Elevated
30Gandhigramગાંધીગ્રામUnder ConstructionPhase 1NoneElevated
31PaldiપાલડીUnder ConstructionPhase 1NoneElevated
32Shreyasશ્રેયસUnder ConstructionPhase 1NoneElevated
33Rajiv Nagarરાજીવ નગરUnder ConstructionPhase 1NoneElevated
34Jivraj Parkજીવરાજ પાર્કUnder ConstructionPhase 1NoneElevated
35APMCએ પી એમ સીUnder ConstructionPhase 1NoneElevated

References

  1. "Project Profile". GMRC. Retrieved 8 March 2019.
  2. "Gujarat nod for Rs 6,758crore Metro Phase II". The Times of India. Retrieved 18 January 2018.
  3. Nair, Avinash (20 October 2018). "Ahmedabad Metro Rail: After Centre objects, Metro rail link to GIFT City shortened by 6 km". The Indian Express. Retrieved 21 October 2018.
  4. "Ahmedabad Metro Phase 2 gets Modi Cabinet clearance ahead of Phase 1 inauguration on 4 March". The Financial Express. 21 February 2019. Retrieved 4 March 2019.
  5. "GMRC Invites Bids for Ahmedabad Metro's Phase 2 Construction". The Metro Rail Guy. 20 January 2020. Retrieved 20 April 2020.
  6. "Ahmedabad Metro Phase 2 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 20 April 2020.
  7. "'Very important gifts for Ahmedabad, Surat': PM Modi launches metro rail projects in Gujarat". www.timesnownews.com. Retrieved 18 January 2021.
  8. "Ahmedabad Metro connectivity to GIFT City by early 2024, says GMRC". 19 September 2021.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.