Nanchang–Jiujiang high-speed railway

The Nanchang–Jiujiang high-speed railway is a planned high-speed railway in China. The line will have a design speed of 350 kilometres per hour (220 mph). It is expected to be completed by 2024.[1]

Nanchang–Jiujiang
high-speed railway
昌九高速铁路
Overview
StatusPlanned
TerminiNanchang East
Lushan
Stations5
Service
Operator(s)China Railway High-speed
Technical
Line length137 km (85 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)

The line runs roughly parallel to the Nanchang–Jiujiang intercity railway but on a faster 350 kilometres per hour (220 mph) alignment. This new line will form part of the Beijing–Hong Kong (Taipei) corridor.

History

A feasibility study for the line was approved in February 2021.[2]

Stations

Station Name Chinese[3] Metro
transfers/connections
Nanchang East 南昌东  2 
Changbei Airport 昌北机场  1 
Gongqingcheng East 共青城东
Lushan South 庐山南
Lushan 庐山

References

  1. "昌九高铁开工建设,江西发展锦上添花". news.gaotie.cn. Retrieved 2021-01-07.
  2. "京港高铁九江至南昌段获批复 江西又将新增一条南北走向高铁线路" [Beijing-Hong Kong high-speed railway Jiujiang to Nanchang section approved Jiangxi will add a new north-south high-speed rail line]. jx.ifeng.com (in Chinese). 24 February 2021. Retrieved 24 February 2021.{{cite web}}: CS1 maint: url-status (link)
  3. "新建京港高速铁路九江至南昌段(昌九高铁)可行性研究报告获批复". 2021-02-23.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.