Pink Line (Delhi Metro)

The Pink Line (Line 7) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India.[1] It consists of 38 metro stations from Majlis Park to Shiv Vihar, both in North Delhi.

Pink Line
(Line 7)
Pink Line near Anand Vihar Station
Overview
StatusOperational
OwnerDelhi Metro
LocaleDelhi
TerminiMajlis Park
Shiv Vihar
Stations38
Service
TypeRapid Transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
Rolling stockHyundai-ROTEM
History
Opened
Technical
Line length59.24 km (36.81 mi)
CharacterUnderground and Elevated
Track gaugeStandard gauge
Electrification25 kV, 50 Hz AC Overhead catenary
Route map

Mukundanpur Depot
Majlis Park
Ring Road
Azadpur
Shalimar Bagh
Netaji Subhash Place
Shakurpur
NH-10 (Rohtak Road)
Punjabi Bagh West
ESI - Basaidarapur
Rajouri Garden
Najafgarh Road
Mayapuri
Naraina Vihar
Delhi Cantonment
Durgabai Deshmukh
South Campus
Sir M. Vishweshwaraiah Moti Bagh
Bhikaji Cama Place
Sarojini Nagar
Dilli Haat - INA
South Extension
Lajpat Nagar
Vinobapuri
Ashram
Sarai Kale Khan - Nizamuddin
Ring Road
Yamuna River
Mayur Vihar-I
Mayur Vihar Pocket I
Trilokpuri Sanjay Lake
East Vinod Nagar - Mayur Vihar-II
Mandawali - West Vinod Nagar
IP Extension
Anand Vihar
Karkarduma
Karkarduma Court
Krishna Nagar
East Azad Nagar
Welcome
Grand Trunk Road
Jaffrabad
Maujpur - Babarpur
Gokulpuri
Johri Enclave
Shiv Vihar

The Pink Line, with a length of 59.24 kilometres (36.81 mi), is the longest individual line in Delhi Metro, breaking the record set by the operational Blue Line (excluding branch line). It is mostly elevated and covers Delhi in an almost 'U' shaped pattern. The Pink Line is also known as the Ring Road Line, as the entire line passes alongside the busy Ring Road in Delhi, that witnesses massive traffic jams every day.

The Pink Line has interchanges with most of the operational lines of the network such as the Red Line at Netaji Subhash Place & Welcome, Yellow Line at Azadpur & Dilli Haat - INA, Green Line at Punjabi Bagh West, Blue Line at Rajouri Garden, Mayur Vihar Phase-I, Anand Vihar & Karkarduma, Dhaula Kuan of Airport Express (Orange Line) at Durgabai Deshmukh South Campus, Violet Line at Lajpat Nagar, as well as with Hazrat Nizamuddin and Anand Vihar Terminal (Indian Railways) and the ISBTs at Anand Vihar and Sarai Kale Khan.

The Pink Line has the highest point of Delhi Metro at Dhaula Kuan with a height of 23.6 metres, passing over the Dhaula Kuan grade separator flyovers and the Airport Express Line.[2] It also possesses the country's smallest metro station, Ashram, with a size of just 151.6 metres against the usual 265 metres. Also, the platform for a six-coach train is 140 metres but has been reduced to 135 metres in the Ashram station.

The line will be extended to Maujpur-Babarpur, creating one of the world's longest ring lines in the city. The Maujpur-Babarpur to Shiv Vihar section will then act as a branch line.

History

The total length of the line is 59.24 kilometres (36.81 mi).[3] There are 38 stations in the Pink Line, out of which 26 are elevated and 12 are underground.

The line was opened in five stages from March 2018 to August 2021. The first section on the Pink Line become operational from 14 March 2018 between Majlis Park to Durgabai Deshmukh South Campus, thereafter the section between Durgabai Deshmukh South Campus and Lajpat Nagar was opened on 6 August 2018, Shiv Vihar to Trilokpuri was opened on 31 October 2018. The section between Lajpat Nagar to Mayur Vihar Pocket I was opened on 31 December 2018.

The section between Trilokpuri Sanjay Lake and Mayur Vihar Pocket I was not completed as construction of a 1.5 km viaduct began late due to land acquisition issues at Trilokpuri.[4] This had rendered the Pink Line into two independent lines. Hence, trains from Majlis Park would go until Mayur Vihar Pocket 1, while trains coming from Shiv Vihar would terminate at either IP Extension or Trilokpuri Sanjay Lake.

The final section between Trilokpuri Sanjay Lake and Mayur Vihar Pocket I was opened on 6 August 2021.[5]

Stations

The stations of the Pink Line are:[6]

Pink Line
# Station Name Phase Opening Interchange Connection Station Layout Platform Layout Depot Connection Depot Layout
English Hindi
1 Maujpur - Babarpur मौजपुर - बाबरपुर 4 March 2023[7]  

(Phase 4 | Under Construction)

Elevated Side None None
2Yamuna Vihar यमुना विहार 4 March 2023 None Elevated Side None None
3Bhajanpura भजनपुरा 4 March 2023 None Elevated Side None None
4Khajuri Khas खजूरी ख़ास 4 March 2023 None Elevated Side None None
5 Sonia Vihar सोनिया विहार 4 March 2023 None Elevated Side None None
6 Soorghat सूरघाट 4 March 2023 None Elevated Side None None
7Jagatpur Village जगतपुर गांव 4 March 2023 None Elevated Side None None
8 Jharoda Majra झड़ौदा माजरा 4 March 2023 None Elevated Side None None
9Burari बुराड़ी 4 March 2023 None Elevated Side None None
10 Majlis Park मजलिस पार्क 3 14 March 2018  Magenta Line 
(Phase 4 | Under Construction)
Elevated Side Mukundpur Depot At Grade
11 Azadpur आज़ादपुर 3 14 March 2018  Yellow Line   Magenta Line 
(Phase 4 | Under Construction)
Underground Island None None
12Shalimar Baghशालीमार बाग़ 314 March 2018 None Underground Island None None
13 Netaji Subhash Place नेताजी सुभाष प्लेस 3 14 March 2018  Red Line  Underground Side None None
14Shakurpurशकूरपुर 314 March 2018 None Elevated Island None None
15 Punjabi Bagh West पंजाबी बाग़ पश्चिम 3 14 March 2018  Green Line 
Elevated Side None None
16ESI - Basaidarapur ईएसआई - बसईदारापुर 3 14 March 2018 None Elevated Side None None
17 Rajouri Garden राजौरी गार्डन 3 14 March 2018  Blue Line  Elevated Side None None
18Mayapuriमायापुरी 314 March 2018 None Elevated Side None None
19Naraina Viharनारायणा विहार 314 March 2018 None Underground Island None None
20Delhi Cantonmentदिल्ली छावनी 314 March 2018 None Elevated Side None None
21 Durgabai Deshmukh South Campus दुर्गाबाई देशमुख साउथ कैम्पस 3 14 March 2018  Airport Express  Elevated Side None None
22Sir M. Vishweshwaraiah Moti Baghसर एम. विश्वेश्वरय्या मोती बाग़ 36 August 2018 None Elevated Side None None
23Bhikaji Cama Placeभीकाजी कामा प्लेस 36 August 2018 None Underground Island None None
24Sarojini Nagarसरोजिनी नगर 36 August 2018 None Underground Island None None
25 Dilli Haat - INA दिल्ली हाट - आईएनए 3 6 August 2018  Yellow Line  Underground Island None None
26South Extensionसाउथ एक्सटेंशन 36 August 2018 None Underground Island None None
27 Lajpat Nagar लाजपत नगर 3 6 August 2018  Violet Line  Underground Island None None
28Vinobapuriविनोबापुरी 331 December 2018 None Underground Island None None
29Ashramआश्रम 331 December 2018 None Underground Island None None
30Sarai Kale Khan - Nizamuddinसराय काले ख़ान - निज़ामुद्दीन 331 December 2018 Hazrat Nizamuddin railway station

Sarai Kale Khan ISBT

Underground Island None None
31 Mayur Vihar – I मयूर विहार-1 3 31 December 2018  Blue Line  Elevated Side None None
32Mayur Vihar Pocket Iमयूर विहार पॉकेट 1 331 December 2018 None Elevated Side None None
33Trilokpuri Sanjay Lakeत्रिलोकपुरी संजय झील 3 31 October 2018None Elevated Side None None
34East Vinod Nagar - Mayur Vihar-II पूर्वी विनोद नगर - मयूर विहार-2 3 31 October 2018 None Elevated Side None None
35Mandawali - West Vinod Nagar मंडावली - वेस्ट विनोद नगर 3 31 October 2018 None Elevated Side None None
36IP Extensionआईपी एक्सटेंशन 331 October 2018 None Elevated Side Vinod Nagar - Ghazipur Depot At Grade

Elevated

37 Anand Vihar आनंद विहार 3 31 October 2018  Blue Line 

Anand Vihar Railway Terminal
Anand Vihar ISBT

Elevated Side None None
38 Karkarduma कड़कड़डूमा 3 31 October 2018  Blue Line  Elevated Side None None
39Karkarduma Court कड़कड़डूमा कोर्ट 3 31 October 2018 None Elevated Side None None
40Krishna Nagarकृष्णा नगर 331 October 2018 None Elevated Side None None
41East Azad Nagarआज़ाद नगर पूर्व 331 October 2018 None Elevated Side None None
42 Welcome वेलकम 3 31 October 2018  Red Line  Elevated Side None None
43Jaffrabadजाफ़राबाद 331 October 2018 None Elevated Side None None
44 Maujpur - Babarpur मौजपुर - बाबरपुर 3 31 October 2018  

(Phase 4 | Under Construction)

Elevated Side None None
45Gokulpuriगोकुलपुरी 331 October 2018 None Elevated Side None None
46Johri Enclaveजौहरी एनक्लेव 331 October 2018 None Elevated Side None None
47Shiv Viharशिव विहार 331 October 2018 None Elevated Side None None
48 Loni लोनी 4 2030 None Elevated Side None None
49 Prem Nagar प्रेम नगर 4 2030 None Elevated Side None None
50 Rameshwar Park रामेश्वर पार्क 4 2030 None Elevated Side None None
51 Tronica City ट्रोनिका सिटी 4 2030 None Elevated Side None None
52 Mandola मंडोला 4 2030 None Elevated Side None None
53 Mandola Vihar मंडोला विहार 4 2030 None Elevated Side None None

    Train Info

    # Pink Line
    1 Rakes Hyundai Rotem BEML
    2 Train Length 6
    3 Train Gauge 4 ft 8+12 in (1,435 mm) standard gauge
    4 Electrification 25 kV, 50 Hz AC through overhead catenary

    OHE

    5 Train's Maximum Speed 100 km/hr
    6 Train Operation Delhi Metro

    Towards → Majlis Park

    North Bound Towards → Majlis Park
    Pink Line
    General Class Reserved For Ladies
    C6 C5 C4 C3 C2 C1

    Towards → Shiv Vihar

    North Bound Towards → Shiv Vihar
    Pink Line
    General Class Reserved For Ladies
    C6 C5 C4 C3 C2 C1

    See also

    References

    1. "Metro comes to north-east Delhi, but it won't be straight line". Times of India.
    2. "New high for Metro with track at 24m". The Indian Express. 26 September 2014.
    3. "Delhi Metro Map". www.delhimetrorail.com. Retrieved 6 August 2021.{{cite web}}: CS1 maint: url-status (link)
    4. May 4, Sidharatha Roy | TNN | Updated; 2018; Ist, 10:08. "Delhi Metro: Missing link at Mayur Vihar-1 in Metro's longest line finally set to be bridged | Delhi News - Times of India". The Times of India. Retrieved 28 May 2019.{{cite web}}: CS1 maint: numeric names: authors list (link)
    5. "Delhi Metro Pink Line's Trilokpuri Sanjay Lake-Mayur Vihar Pocket-1 stretch inaugurated". The Hindu. Special Correspondent. 6 August 2021. ISSN 0971-751X. Retrieved 6 August 2021.{{cite news}}: CS1 maint: others (link)
    6. "Metro Network Phase I, II, III & NCR" (PDF). Delhi Metro Rail Corporation Ltd (DMR). February 2015. Retrieved 28 June 2015.
    7. "Some sections of Delhi Metro's phase 4 to be opened by Mar 2023 says DMRC Chief".