MRTJ 1000 series
The MRT Jakarta 1000 series Ratangga, known legally as the Series K1 1 18,[lower-alpha 1] are the first rolling stocks to operate in the MRT Jakarta system. Built by Nippon Sharyo under Contract CP108, all sets were built in 2018 and started operation on 24 March 2019.
MRT Jakarta Series K1 1 18 MRT Jakarta 1000 series Ratangga | |
---|---|
![]() Set 03 with Jak Lingko logo. | |
In service | 2019–present |
Manufacturer | Nippon Sharyo |
Order no. | CP 108 |
Built at | Toyokawa, Aichi, Japan |
Family name | STRASYA |
Constructed | 2018 |
Entered service | 24 March 2019 |
Number built | 96 vehicles (16 sets) |
Number in service | 96 vehicles (16 sets) |
Formation | 6-car sets Tc1-M2'-M1'-M2-M1-Tc2 |
Fleet numbers | 01-16 |
Operator(s) | MRT Jakarta |
Depot(s) | Lebak Bulus |
Line(s) served | North–South Line |
Specifications | |
Car body construction | Stainless steel |
Train length | 118.15 m (387 ft 8 in) |
Car length | 20,075 mm (65 ft 10.4 in) (leading car) 19.5 m (64 ft 0 in) (intermediate car) |
Width | 2.95 m (9 ft 8 in) |
Height | 3,655 mm (11 ft 11.9 in) (roof) 3,985 mm (13 ft 0.9 in) (top of AC) 3,995 mm (13 ft 1.3 in) (top of folded pantograph) |
Floor height | 1,150 mm (3 ft 9 in) |
Doors | 4 per side |
Wheel diameter | 860 mm (34 in) (new) 820 mm (32 in) (worn) |
Wheelbase | 2,100 mm (6 ft 11 in) |
Maximum speed | 100 km/h (62 mph) |
Traction system | Toyo Denki RG6036-A-M IGBT–VVVF |
Traction motors | 16 × Toyo Denki TDK6326-A 140 kW (190 hp) 3-phase AC induction motor |
Power output | 2.24 MW (3,000 hp) |
Acceleration | 0.92 m/s2 (3.0 ft/s2) |
Deceleration | 0.8 m/s2 (2.6 ft/s2) (service) 1.0 m/s2 (3.3 ft/s2) (emergency) |
Electric system(s) | 1,500 V DC (nominal) from overhead catenary |
Current collector(s) | Pantograph |
UIC classification | 2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′ |
Bogies | ND-748 (powered), ND-748T (trailer) |
Safety system(s) | Nippon Signal SPARCS moving block CBTC ATC under ATO GoA 2 (STO), with subsystems of ATP, ATS and CBI |
Coupling system | Shibata |
Track gauge | 1,067 mm (3 ft 6 in) narrow gauge |
Seating | Longitudinal |
History
Contract CP 108 for the procurement of rolling stock for the Jakarta MRT was awarded to a consortium led by Sumitomo Corporation, on 3 March 2015.[1] 16 six-car trainsets were ordered at a cost of ¥10.8 billion (Rp. 145 billion).[2] The trains were built in Nippon Sharyo's Toyokawa, Aichi plant.[3]
Specifications
Each car measures 20 m (65 ft 7 in) in length, 2.9 m (9 ft 6 in) in width and 3.9 m (12 ft 10 in) in height.[4] These trains utilizes CBTC signaling system and are equipped with Automatic Train Operation (ATO) GoA 2, with drivers operating the doors and driving in case of emergency.[5] Like the KRL Commuterline, the MRT trains are also powered via overhead catenary.[6]
Naming and service
On 10 January 2018, the Governor of Jakarta, Anies Baswedan gave the first batch of MRT Jakarta trainsets the name "Ratangga". The name was derived from the old Javanese word for chariots.[7] It offers a women-only carriage during morning peak hours from 7AM to 9AM and in the afternoon from 5PM to 7PM.[8]
Gallery
- Side view on the train
- Interior
- The train departing ASEAN MRT station
Notes
- Classified legally as executive-class trains by the Ministry of Transportation, hence the K1.
References
- "Kontrak Rolling Stock Proyek MRT Jakarta Ditandatangani" (PDF) (Press release) (in Indonesian). PT MRT Jakarta. 3 March 2015. Archived from the original (PDF) on 16 March 2015.
- Ady Sukarno, Puput (3 March 2015). "PROYEK MRT JAKARTA: Sumitomo Corporation Menangkan Tender Kereta Listrik". Bisnis.com. Retrieved 23 July 2020.
- Riana, Friski (11 December 2017). "Melihat Kereta MRT Jakarta Diproduksi: Tak Lagi Mirip Jangkrik". Tempo (in Indonesian). Retrieved 4 April 2019.
- "Kereta MRT Jakarta: Untuk Kenyamanan Mobilitas Penumpang". MRT Jakarta (in Indonesian). 16 January 2018. Retrieved 4 April 2019.
- "CBTC: Untuk Keamanan, Kenyamanan, dan Keandalan MRT Jakarta". MRT Jakarta (in Indonesian). 3 December 2017. Retrieved 4 April 2019.
- "MRT Jakarta to be fully operational in 2024". Investor Daily. PwC. 2 July 2018.
- Farozy, Iko Haidar (10 December 2018). "Nama Kereta MRT Jakarta Diresmikan Gubernur DKI". Railway Enthusiast Digest. Retrieved 10 December 2018.
- "MRT Sediakan Satu Kabin Kereta Khusus Penumpang Wanita di Jam-jam Sibuk". Tribunnews.com (in Indonesian). 13 March 2019. Retrieved 4 April 2019.