Yellow line, also called Kaohsiung Metropolitan line, is a planned medium capacity, rapid transit line on the Kaohsiung Mass Rapid Transit, currently done planning and under project review process. It's projected to begin commencement building work in 2020.[1]
Kaohsiung Metropolitan Line (The Yellow Line) | |
---|---|
![]() | |
![]() The Yellow Line Route Map (Kaohsiung MRT) | |
Overview | |
Native name | 高雄捷運都會線(黃線) |
Status | Under review |
Locale | Kaohsiung City, ![]() |
Termini | Kaohsiung Cruise Terminal Station & Cianjhen Senior High School Station Dìbù (坔埔) |
Stations | 21 |
Service | |
Type | Medium-capacity rail transport system |
System | Kaohsiung MRT system |
Operator(s) | Kaohsiung Rapid Transit Corporation |
Depot(s) | Niaosong depot |
Technical | |
Character | Underground, elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
History
The initial plan of the yellow line was first seen in 2002 when the whole MRT construction plan for Kaohsiung was being re-sketched.[2]
By the spring of 2015, the director Wu Yi-Long (吳義隆) of Kaohsiung City Government's Mass Rapid Transit Bureau addressed to the local parliament that the yellow line of light rail transit was undergoing feasibility assessment whose route was likely a combination of old-drafted yellow line and Brown Line, which was hoped to be the second circular public transportation line across Kaohsiung City preceded by the first circular line in Kaohsiung and the whole nation. [3][4]
On 14 February 2017, four members of the Legislative Yuan representing Kaohsiung and affiliated with the Democratic Progressive Party, namely Liu Shyh-fang, Lee Kun-tse, Lai Jui-lung, and Hsu Chih-chieh had held a joint press conference unveiling the new draft of the route for the yellow line and asked the Executive Yuan to comprise this plan into The Forward-looking project, whose bid was later agreed and approved by the yuan to be included in on March 23. [5]。
On March 27, few days after the approval of the yuan, local MRT bureau submitted the feasibility study of the yellow line to the authorities concerned of the central government. In the study, the line was planned to be an underground system whose route basically combines planned Brown Line, Fongshan Line, and Wujia section of the Green Line.
In April 2022, the Executive Yuan approved the construction of the line.[6]
Stations
The following graph is the route map for the drafted yellow line only, except other intersecting lines like Green Line and Silver Line.
According to the plan, the yellow line has two start points from Cruise Terminal and MRT Cianjhen Senior High School Station respectively and an end point at Dipu township, Niaosong District, Kaohsiung City. The part begins from Y1 to Y13 is also called Jiangong-Minzu (建工民族) Line while the section between Y1 and Y21 is called Chenching-Wujia (澄清五甲) Line.
Please note that the Station names and locations are tentatively planned.

Branch | Code | Station Name | Transfer | Location | ||
---|---|---|---|---|---|---|
English | Chinese | |||||
● | ● | Y01 | Dipu | 坔埔 | Niaosong District | |
● | ● | Y02 | Cizhijiao | 崎子腳 | ||
● | ● | Y03 | Niaosong | 鳥松 | ||
● | ● | Y04 | Chang Gung Memorial Hospital | 長庚醫院 | ||
● | ● | Y05 | Chengcing Lake | 澄清湖 | ||
● | | | Y06 | Dahua | 大華 | ||
● | | | Y07 | Benguan | 本館 | ||
● | | | Y08 | Kaohsiung Industrial High School | 高雄高工 | ![]() |
Sanmin District |
● | | | Y09 | Dagang | 大港 | ||
● | | | Y10 | Minzu | 民族 | ![]() | |
● | | | Y11 | Sinyi Elementary School Station | 信義國小 | ![]() |
Sinsing District |
● | | | Y12 | Sihwei Administration Center | 四維行政中心 | Cianjhen District Lingya District | |
● | | | Y13 | Sanduo Market | 三多市場 | ||
● | | | Y14 | Sanduo Shopping District | 三多商圈 | ![]() | |
● | | | Y15 | Cruise Terminal | 旅運中心 | ![]() |
Lingya District |
● | Y16 | Baoye Detention Park | 寶業滯洪公園 | Sanmin District | ||
● | Y17 | Zhengyi | 正義 | ![]() |
Lingya District | |
● | Y18 | Weiwuying | 衛武營 | ![]() | ||
● | Y19 | Sinjia | 新甲 | Fongshan District | ||
● | Y20 | Cilaoye | 七老爺 | |||
● | Y21 | Wujia | 五甲 | |||
● | Y22 | Longcheng Temple | 龍成宮 | |||
● | Y23 | Cianjhen Senior High School | 前鎮高中 | ![]() |
Cianjhen District | |
References
- "Kaohsiung plans to build third MRT line within 8 years - Economics - CNA ENGLISH NEWS". FOCUS TAIWAN. 21 April 2017. Retrieved 21 July 2017.
- 高雄市政府捷運工程局—長期路網規劃—黃線
- "雙軌雙環 串起高雄經濟脈絡". 中時電子報. 2015-03-02. Retrieved 2015-04-24.
- 高雄市議會 (2015-04-20). "第2屆第1次定期大會捷運工程局業務報告" (ppt). Retrieved 2015-04-24.
- "砸千億!高捷新增黃線 紅線延伸到路竹". 蘋果即時新聞. 2017-03-23. Retrieved 2017-03-23.
- Tsai, Meng-yu; Yeh, Joseph (20 March 2022). "New Kaohsiung MRT line approved; construction to start later this year". Central News Agency. Retrieved 20 April 2022.