Line 13 is a north-west to south-east line of the Shanghai Metro network. It runs between Jinyun Road in Jiading and Zhangjiang Road in Pudong. It was once used as a dedicated line (Expo line) for the World Expo to serve the 2010 Shanghai World Expo.

Line 13
Overview
Other name(s)M5 (planned name); Expo line (former name)
StatusOperational
LocalePudong, Huangpu, Jing'an, Putuo, and Jiading districts
Shanghai
TerminiJinyun Road
Zhangjiang Road
Stations36
Service
Type Rapid transit
System Shanghai Metro
Operator(s)Shanghai No. 2 Metro Operation Co., Ltd.
Depot(s)Beidi Road depot;
Chuanyang River parking lot
Rolling stock62 Type A 6-car trains
Daily ridership737,800 (2019 peak)[1]
History
CommencedMarch 21, 2007 (2007-03-21) (Expo line section)
OpenedApril 20, 2010 (2010-04-20) (As Expo line from Madang Road to Shibo Avenue)
Last extensionDecember 30, 2018 (2018-12-30)
ClosedNovember 2, 2010 (2010-11-02) (Expo line)
ReopenedDecember 30, 2012 (2012-12-30)
Technical
Line length38.3 km/h (23.80 mph)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines 1.5kV DC
Operating speed80 km/h (50 mph)
SignallingALSTOM Urbalis CBTC
Route map
To scale geographic map:

History

Special Phase

The Special Phase of Line 13 operated between Madang Road and Shibo Avenue, during the 2010 Shanghai World Expo. After the Expo ended, this phase was closed.

1st Phase

The 1st Phase of Line 13 ran between all the stations between Jinyun Road and Jinshajiang Road, with 7 stations. The section opened on December 2012.[2]

2nd Phase and 3rd Phase

The two phases ran from Changqing Road to Zhangjiang Road in Zhangjiang Hi-Tech Park region. The rest of the line was opened on December 19, 2015.

Shanghai Metro Line 13 opening history
SegmentCommencemedOpenedLengthStation(s)NameInvestment
Madang Road — Shibo Avenue 21 March 200720 April 2010 4.0 km (2.49 mi) 3 Expo line (special phase)1.338 billion
2 November 2010 Temporary ceased operation -3
Jinyun Road — Jinshajiang Road 28 December 200830 December 2012 9.9 km (6.15 mi) 5 Phase 1 (1st section)12.417 billion yuan
South Qilianshan Road 15 June 2013 Infill station 1
Daduhe Road 1 November 2014 Infill station 1
Jinshajiang Road — Changshou Road 28 December 2014 2.9 km (1.8 mi) 3 Phase 1 (2nd section)
Changshou Road — West Nanjing Road 19 December 2015 2.6 km (1.6 mi) 4 Phase 1 (3rd section)
West Nanjing Road — Madang Road 20 November 2009 2.8 km (1.7 mi) 2 Expo line (1st section)4.521 billion yuan
Madang Road — Shibo Avenue Reentered operation 3
Shibo Avenue — Changqing Road 30 December 2018 1.0 km (0.6 mi) 1 Expo line (2nd section)
Changqing Road — Middle Huaxia Road 31 December 2013 10.5 km (6.5 mi) 8 Phase 212.932 billion yuan
Middle Huaxia Road — Zhangjiang Road 30 March 2014 4.8 km (3.0 mi) 3 Phase 3
Zhuguang Road - Jinyun Road 28 June 2021end 2025 (exp.) 9.5 km (5.9 mi) 5 West extension12.629 billion yuan

Stations

Service routes

Shanghai Metro Line 13 service routes
Routes Station name Connections Distance Location Open-
ing
Plat-
form[3]
M P English Chinese km min
Zhuguang Road 诸光路  17  0.00 0.00 0 Minhang u/c Underground Island
Yunle Road 运乐路 1.781 1.781
Jile Road 季乐路 1.120 2.901
Fangle Road 芳乐路 0.996 3.897 Underground Side & Island
Jidi Road 纪翟路 1.443 5.340 Underground Island
Jinyun Road 金运路 0.00 0.00 0 Jiading 30 Dec
2012[4]
Underground Island
West Jinshajiang Road 金沙江西路 1.52 1.52 3
Fengzhuang 丰庄 1.94 3.46 6
South Qilianshan Road 祁连山南路 1.31 4.77 8 Putuo 15 June
2013[5]
Zhenbei Road 真北路 1.48 6.25 11 30 Dec
2012[4]
Daduhe Road 大渡河路  15  1.24 7.49 13 1 Nov
2014[6]
Underground Side
Jinshajiang Road 金沙江路  3   4  1.62 9.11 16 30 Dec
2012[4]
Underground Island
Longde Road 隆德路  11  1.21 10.32 18 28 Dec
2014[7]
Wuning Road 武宁路  14  0.85 11.17 20
Changshou Road 长寿路  7  1.08 12.25 22
Jiangning Road 江宁路 0.70 12.95 24 19 Dec
2015[8]
Hanzhong Road 汉中路  1   12  1.63 14.58 27 Jing'an
Shanghai Natural History Museum 自然博物馆 0.65 15.23 28
West Nanjing Road 南京西路  2   12 [lower-alpha 1] 0.86 16.09 31 Underground Side
Middle Huaihai Road 淮海中路 0.96 17.05 33 Huangpu Underground Island
Site of the First CPC National Congress · Xintiandi 一大会址·新天地  10  1.21 18.26 35
Madang Road 马当路  9  0.63 18.89 37 19 Dec
2015[8][lower-alpha 2]
World Expo Museum 世博会博物馆 1.53 20.42 40
Shibo Avenue 世博大道 1.61 22.03 42 Pudong Underground Side & Island
Changqing Road 长清路  7 [lower-alpha 3] 0.89 22.92 44 30 Dec
2018[11]
Underground Island
Chengshan Road 成山路  8  1.16 24.08 46
Dongming Road 东明路  6  1.40 25.48 48
Huapeng Road 华鹏路 1.15 26.63 51
Xianan Road 下南路 1.82 28.45 53
Beicai 北蔡 1.07 29.52 56
Chenchun Road 陈春路 0.93 30.45 58
Lianxi Road 莲溪路  18  1.34 31.79 60
Middle Huaxia Road 华夏中路  16  1.77 33.56 62 Underground Double Island
Zhongke Road 中科路 1.06 34.62 65 Underground Island
Xuelin Road 学林路 1.96 36.58 68
Zhangjiang Road 张江路 1.69 38.27 70

Important Stations

Future Expansion

Shanghai Metro Line 13 West Extenion

It will be extended for 9.47 km from Jinyun Road station to Zhuguang Road station on Line 17 and add 5 stations.[12] The stations are: Jizhai Road station; Fangle Road station; Jile Road station; Yunle Road station; and Zhuguang Road station. Construction started on June 28, 2021.

Station name change

Headways

Shanghai Metro Line 13 headway[13]
TimeJinyun Road -
Huapeng Road
Huapeng Road -
Zhangjiang Road
Monday - Friday (Working Days)
Morning peak7:30–9:30About 2 minutes and 30 secondsAbout 5 minutes
Off-peak9:30–17:00About 6 minutes
Evening peak17:00–19:30About 3 minutesAbout 6 minutes
Other hours
First Train — 7:30
19:30 — Last Train
About 6 – 10 minutes
Saturday and Sunday (Weekends)
Peak hours8:30–20:30About 5 minutes
Other hours
First Train — 8:30
20:30 — Last Train
About 6 - 10 minutes
Extended Operation Interval (Friday, Saturday)
Extended Operation22:30 - End of OperationAbout 15 minutes ~ 20 minutes

Technology

Rolling Stock

The trains of Line 13 are composed of 6-carriages A-cars, with a design speed of 80 km/h, VVVF AC drive, and a design life of 30 years and are China's first domestically developed trains. Trains have a capacity of about 1,860 people. Carriages are 23.54 meters in length, 3.0 meters in width and 3.8 meters in height.

Shanghai Metro Line 13 rolling stock
SetManufacturerTime of
manufac-
turing
TypeNo
of
car
Assembly[lower-alpha 4]SetsNumberNotes
24CRRC Nanjing Puzhen Co., Ltd.2011-2014A6Tc+Mp+M+M+Mp+Tc13A011301-1324
38CRRC Nanjing Puzhen Co., Ltd.2016-2018A6Tc+Mp+M+M+Mp+Tc13A021325-1362[14]
Shanghai Metro Line 13/Expo Line former rolling stock
SetManufacturerTime in
oper-
ation
TypeNo
of
car
AssemblySetsNumberNotes
5Bombardier Movia 4562010A6Tc+Mp+M+M+Mp+Tc09A021301-1305Seconded from Line 9, operated only used during 2010 Shanghai World Expo on the Expo line. Returned to Line 9 afterwards (set 09A02; numbers 942-945, 948).

Cars 09A02 (numbers 942-945, 948) were used in the past, only used during the 2010 Shanghai World Expo, which were reassigned from Line 9 to line 13, all of which have now been transferred back to line 9.

Notes

  1. Virtual transfer with Line 2 or Line 12 – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.
  2. 20 April 2010-2 November 2010: (as the Expo 2010 Line).[9][10]
  3. Virtual transfer with Line 7 – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.
  4. Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.

References

  1. 2019最后一天上海地铁运送客流【1303.35万人次】跨年夜延时加开63列次 (in Chinese). 上海地铁shmetro. 2020-01-02. Retrieved 2020-01-09.
  2. Shanghai Eastday, 7 February 2012.
  3. 乘车指南 > Station信息. Shanghai Metro Official Site. Retrieved 2015-12-17. Instructions: 点击相应线路,选择Station,点击"站层图"可查看相应Station的站台结构。
  4. 13号线一期西段12月30日起载客试运营. Shanghai Metro Official Site. 2012-12-28.
  5. 13号线祁连山南路站6月15日起开站迎客. Shanghai Metro Official Site. 2013-06-14.
  6. 13号线大渡河路站11月1日开站. Shanghai Metro Official Site. 2014-10-29.
  7. 13、16号线12月28日新增5站试运营. Shanghai Metro Official Site. 2014-12-25.
  8. 上海地铁运管中心 (2015-12-17). 12月19日起 11、12、13号线新延伸段建成试运营. Shanghai Metro Official Site. Retrieved 2015-12-17.
  9. 上海世博园试运行 中国馆成热点. 中国政府网. 2010-04-20. Retrieved 2015-12-17.
  10. 上海地铁明起取消涉博加班车 13号线2日起暂停. Tencent (QQ) News. 2010-11-01. Archived from the original on 2015-12-17. Retrieved 2015-12-17.
  11. 连接莘庄和闵行 轨道五号线开通试运营. Sina. 2003-11-25.
  12. "《上海市轨道交通13号线西延伸工程选线专项规划》公示". Archived from the original on 2020-11-03. Retrieved 2021-03-10.
  13. "Schedule" (in Chinese). Shanghai Metro. 2021-07-07. Retrieved 2021-07-07.
  14. 上海地铁十三号线列车. 中车南京浦镇车辆有限公司 (in Chinese). Retrieved 2020-03-20.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.