Pemalang-Batang Toll Road

Pemalang-Batang Toll Road or abbreviated to Pematang Toll Road, is a 39.2 kilometer highway that connects Pemalang area with Batang, Central Java, Indonesia. This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java. The toll road is fully opened on November 9, 2018 by 7th President of Indonesia Joko Widodo.[1][2]

Pemalang-Batang Toll Road
Pematang Toll Road
Route information
Part of AH2
Maintained by PT Pemalang Batang Tol Road
Length39 km (24 mi)
Major junctions
FromPemalang
Major intersectionsBatang-Semarang Toll Road
Pejagan–Pemalang toll road
ToBatang
Location
CountryIndonesia
Major citiesPekalongan, Pemalang
Highway system

Sections

This toll road has two sections:[3]

  • Section I: (Pemalang - Pekalongan), length 20,05
  • Section II: (Pekalongan - Batang), length 16,7 km.

Toll gates

Note: The number on the exits is based on the distance from the western terminus of the Jakarta-Cikampek Toll Road, while the distance numbers are based on the distance from the western terminus of this toll road only

ProvinceLocationkmmiExitNameDestinationsNotes
Central JavaPemalang Regency00.0312Pemalang Toll GatePemalang, ComalWestern terminus
Pekalongan Regency19.1411.89331Bojong Toll GatePekalongan, Kajen
Batang Regency29.7418.48341Warungasem Toll GateBatang, Pekalongan
36.4822.67348Kandeman Toll GateBatang, Subah, KandemanEastern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.