North–South Line (Jakarta MRT)

The North–South line is a rapid transit line of the Jakarta MRT. Coloured darker red on the map, the line is currently 15.7 km long and serves 13 stations. It is the first line of the Jakarta MRT.

North–South Line
M
Overview
Native nameLin Utara–Selatan
StatusOperational (Phase 1)
Under Construction (Phase 2A)
OwnerMinistry of Transportation
LocaleJakarta, Indonesia
TerminiLebak Bulus
Bundaran HI
Stations13
Service
TypeRapid transit
SystemJakarta MRT
Services1
Operator(s)PT MRT Jakarta
Depot(s)Lebak Bulus
Ancol Barat (future)
Rolling stock16 six-car MRTJ 1000 series trainsets
History
Opened24 March 2019 (2019-03-24)
Technical
Line length15.7 km (9.8 mi)
CharacterElevated
Underground
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC overhead catenary
Operating speedlimit of 100 km/h (62 mph)
Route map

↑ Phase 2 
 
Ancol Barat Depot
Ancol
Jakarta Inner Ring Road
Ancol Marina
Mangga Dua
↑ Phase 2B
Kota
Glodok
Mangga Besar
Sawah Besar
Harmoni
↑ Phase 2A II: opening 2027
Monas
Thamrin
 M2 
↑ Phase 2A I: opening 2025
BHI
Bundaran HI
DKA
Dukuh Atas BNI
()
BNI City Sudirman
West Flood Canal
Dukuh Atas
STB
Setiabudi Astra
BNH
Bendungan Hilir
Jakarta Inner Ring Road
IST
Istora Mandiri
SNY
Senayan
SSM
ASEAN
BLM
Blok M BCA
BLA
Blok A
HJN
Haji Nawi
CPR
Cipete Raya
Jakarta Outer Ring Road
FTM
Fatmawati Indomaret
LBB
Lebak Bulus Grab
Lebak Bulus Depot

History

Jakarta MRT underground section between Dukuh Atas station and Bundaran HI, in March 2018

Phase 1

A total of eight contracts were awarded.

  • CP 101 (Construction of Lebak Bulus Depot, Lebak Bulus station and related elevated works) awarded to Tokyu Corporation - Wijaya Karya consortium.
  • CP 102 (Construction of Cipete Raya and Fatmawati stations and related elevated works) awarded to Tokyu Corporation - Wijaya Karya consortium.
  • CP 103 (Construction of Haji Nawi, Blok A, Block M and ASEAN stations and related elevated works) awarded to Obayashi Corporation - Shimizu Corporation - PT Jaya Konstruksi JV.
  • CP 104 (Construction of Senayan and Istora stations and related tunnelling works awarded to Shimizu Corporation - Obayashi Corporation - PT Wijaya Karya - PT Jaya Konstruksi JV.
  • CP 105 (Construction of Bendungan Hilir and Senayan stations and related tunnelling works awarded to Shimizu Corporation - Obayashi Corporation - PT Wijaya Karya - PT Jaya Konstruksi JV.
  • CP 106 (Construction of Dukuh Atas and Bundaran HI stations and related tunnelling works awarded to Sumitomo Mitsui Construction - PT Hutama Karya consortium.
  • CP 107 (Construction of railway systems and trackworks) awarded to Metro One consortium.
  • CP 108 (Construction of rolling stock) awarded to Sumitomo Corporation - Nippon Sharyo consortium.

On 1 June 2013, the first three civil contracts for the 9.2 km (5.7 mi) underground section were signed. Three civil engineering contracts for the elevated section were signed in the third quarter of 2013. Construction work began in October 2013.[1]

Tunnelling was completed on 23 February 2017, meeting the target completion date.[2] By October 2017, the construction of both elevated and underground line sections were completed.[3]

Ahead of its official opening, a limited public trial run was conducted from 12 March 2019 to 23 March 2019. The official opening ceremony was held on 24 March 2019 by the Indonesian president, Joko Widodo.[4][5]

Phase 2

A total of nine contracts were put up.

  • CP 200 (Construction of underground electrical substation near Monas station) awarded to PT Trocon Indah Perkasa.
  • CP 201 (Construction of Thamrin and Monas stations and related tunnelling works) awarded to Shimizu Corporation - PT Adhi Karya JV.
  • CP 202 (Construction of Harmoni, Sawah Besar and Mangga Besar stations and related tunnelling works).
  • CP 203 (Construction of Glodok and Kota stations and related tunnelling works) awarded to Sumitomo Mitsui Construction Company - PT Hutama Karya JO.
  • CP 204 (Construction of depot at Ancol Barat).
  • CP 205A (Construction of railway systems and trackworks from Bundaran HI to Mangga Besar stations).
  • CP 205B (Construction of railway systems and trackworks from Mangga Besar to Kota stations) awarded to Sumitomo Mitsui Construction Company - PT Hutama Karya JO
  • CP 206 (Construction of 14 sets of rolling stock).
  • CP 207 (Installation of Automatic Fare Collection system).

Groundbreaking for Phase 2 was initially planned to begin on 19 December 2018. However, due to land acquisition issues, it was pushed back to January 2019. On 30 January 2019, President Director of PT MRT Jakarta, William Sabandar announced that the groundbreaking ceremony is delayed again as the State Secretariat has yet to issue a land-use permit for the area near Medan Merdeka.[6] The groundbreaking ceremony for Phase 2 was finally held on 24 March 2019 and advanced works began in June 2019 near the future Monas station.[7]

Site works for contract CP201 were originally planned to begin in March 2020. However, due to the COVID-19 pandemic, it was pushed back three months, to June 2020.[8] Site works for contract CP203 began in September 2021.[9]

Route

Jakarta MRT set 11 departing from Lebak Bulus station
Jakarta MRT train departing from Bundaran HI station and approaching Blok M station
Region Station Name Transfers/Notes
Phase 2B (planned)
North Jakarta Ancol Barat Future terminal station
Ancol Marina (5H) K5-1 Ancol (planned)
Mangga Dua Kampung Bandan (planned)

(5K) K12-8 Mangga Dua (planned)

Phase 2A (under construction, operational by 2027)
West Jakarta Kota Future Phase 2A terminus

Jakarta Kota (planned)

(4M) (5K) K1-20 Kota (planned)

Glodok (4M) K1-19 Glodok (planned)
Mangga Besar (4M) K1-17 Mangga Besar (planned)
Central Jakarta Sawah Besar (10H) K1-16 Sawah Besar (planned)
Harmoni (5H) (7F) (10H) (12M) K1-15 Harmoni (planned)
Phase 2A (under construction, operational by 2025)
Central Jakarta Monas (7F) K1-14 Monas (planned)
Thamrin  M2  Planned interchange station to  M2 

Transjakarta K1-13 Bank Indonesia (planned)

Phase 1
Central Jakarta Bundaran HI Phase 1 terminus

K1-11 Bundaran HI

Dukuh Atas BNI Sudirman

BNI City

Dukuh Atas (U/C)

(4C) (13C) K1-9 Dukuh Atas 1

(L4) K4-17 Dukuh Atas 2

Setiabudi Astra
Bendungan Hilir
Istora Mandiri (4C) K1-5 Polda Metro Jaya
Senayan (4C) (10H) K1-3 Bundaran Senayan
South Jakarta ASEAN[10] Initially named 'Sisingamangaraja'

(10H) K1-3 Masjid Agung

(10H) K1-2 ASEAN

(10H) K1-2 Kejaksaan Agung

(13C) (13D) (13E) (13F) K13-4 CSW 1

Blok M BCA (4K) (10H) K1-1 Blok M

Blok M Bus Terminal (via short walk)

Blok A
Haji Nawi
Cipete Raya
Fatmawati Indomaret
Lebak Bulus Grab Terminal station

K8-1 Lebak Bulus

Lebak Bulus Bus Terminal (via short walk)