List of generating stations in Alberta
This is a list of electrical generating stations in Alberta, Canada.
Alberta produces a large share of its electricity through natural gas and a decreasing share of its electricity through coal (the latter to be phased out by 2023, seven years ahead of the provincial and federal phase-out).[1] Over the last few years, a booming economy and the deregulation of the electricity market has led to the construction of dozens of new facilities—primarily[2] alternatives (cogeneration, waste heat recovery) and renewables (e.g. wind, solar, biomass, biogas)—and the retirement of over a dozen coal-fired and older gas-fired units.[2][3]
Fossil fuel
Coal
List of all coal power plants in Alberta.
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Genesee Generating Station units 1 & 2 | 53°20′35″N 114°18′11″W | 860 | 1989–1994 | Capital Power | [4] |
Genesee Generating Station unit 3 | 53°20′35″N 114°18′11″W | 466 | 2005 | Capital Power | [5] |
Battle River Generating Station units 1 & 2 | Forestburg | (56) | (1998) | Heartland Generation | [6] |
Keephills Generating Station unit 1 | Duffield | 395 | (2021) | TransAlta | - |
Keephills Generating Station unit 3 | Duffield | 466 | (2021) | Capital Power | [8] |
Sundance Power Station units 4 & 5 | 53°30′27″N 114°33′26″W | 812 | (2021) | TransAlta | [9] |
H. R. Milner Generating Station | Grande Cache | (158) | (2019) | Milner Power | [10] |
Wabamun Generating Station Units 1–4 | Wabamun | (570) | (2003–2010) | TransAlta | [11] |
Natural gas
List of all natural gas power plants in Alberta including cogeneration.
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Alberta Power Project – Burdett | Burdett | 7 | 2001 | Maxim Power | [12] |
Alberta Power Project – Coaldale | Coaldale | 6 | 2001 | Maxim Power | |
Alberta Power Project – Taber | Taber | 8 | 2001 | Maxim Power | |
Aurora Generating Station | Aurora | 85 | 1999 | Syncrude | [13] |
Balzac Power Station Nexen Inc | Balzac | 120 | 2001 | Nexen | [14] |
Battle River Generating Station unit 5 | Forestburg | 385 | 2021 | Heartland Generation | [15] |
Bear Creek Gas Turbine 1 & 2 | Grande Prairie | 100 | 2002 | TransCanada | [16] |
Bellshill Power Centre | Galahad | 5.6 | 2015 | Genalta Power | [17] |
Cadotte Power Centre | Peace River | 20 | 2012 | Genalta Power | [18] |
Calgary Energy Centre | Calgary | 320 | 2002 | Enmax | [19] |
Carseland Power Plant | Carseland | 95 | 2001 | TransCanada | |
Carson Creek Power Centre | Whitecourt | 15 | 2014 | Genalta Power | [20] |
Cavalier Gas Plant | Strathmore | 120 | 2001 | Enmax | |
Clover Bar Energy Centre | 53°35′14″N 113°21′56″W | 250 | 2008–2009 | Capital Power | [21] |
Cold Lake | Cold Lake | 168 | 2002 | Imperial Oil | |
Crossfield Energy Centre | Rocky View | 144 | 2009 | Enmax | [22] |
Cascade | Yellowhead County | 900 | 2023 | Kineticor Resource Corp | [23] |
Drywood | Drywood | 6 | 2000 | TransAlta | |
Empress Cogeneration Power Facility | Cypress County | 45 | 2023 | Pembina Pipeline | [24] |
Fort Saskatchewan Cogeneration Plant | Fort Saskatchewan | 118 | 1999 | Strongwater Energy, TransAlta | [25] |
Foster Creek Cogeneration | Bonnyville | 98 | 2003 | Cenovus | |
Genesee Power Plant Natural Gas Conversion | Leduc County | 1360 | 2024 | Capital Power | [26] [27] |
Harvest Operations Gas Fired Power Plant | Flagstaff County | 5.6 | 202x | Harvest Operations Corp. | [28] |
Heartland Petrochemical Complex | Strathcona County | 116 | 2021 | Inter Pipeline Ltd. | [29] |
H. R. Milner Generating Station | Grande Cache | 208 | 2020 | Milner Power | [30] |
Joffre Cogeneration Plant | Red Deer | 474 | 2000 | Capital Power Corporation, NOVA Chemicals, Heartland Generation | [31] |
Judy Creek Power Centre | Whitecourt | 15 | 2014 | Genalta Power | [32] |
Kaybob South #3 Cogeneration Plant | Greenview County | 40 | 2022 | TransAlta, SemCAMS | [33] |
Keephills Generating Station unit 2 | Duffield | 395 | 2021 | TransAlta | [34][35] |
Keephills Generating Station unit 3 | Duffield | 463 | 2021 | Capital Power | [36] |
MacKay River Power Plant | Fort McMurray | 207 | 2003 | TransCanada | |
Mazeppa Gas Plant | Mazeppa | 17 | MFC Resource Partnership | ||
Medicine Hat Cogeneration Plant | Medicine Hat | 255 | 2007–2009 | City of Medicine Hat | |
Muskeg River Mine Cogeneration Station | 57°18′0″N 111°30′0″W | 172 | 2002 | Heartland Generation | [37][38] |
Northern Prairie Power Project | Grande Prairie | 105 | 2008 | Constellation Energy | [39] |
Peace River Power Centre | Peace River | 20 | 2015 | Genalta Power | [40][41] |
Poplar Creek Cogeneration Plant | Fort McMurray | 376 | 2001 | TransAlta | |
Poplar Hill Generating Plant | Grande Prairie | 48 | 1999 | Heartland Generation | [42] |
Primrose Cogeneration Plant | Primrose | 100 | 1998 | Canadian Natural resources, Heartland Generation | [43] |
Rainbow Lake Generating Station | Rainbow Lake | 97 | 1968–2001 | Heartland Generation, Husky Oil | [44][45] |
Redwater Cogeneration | Redwater | 92 | 2001 | TransCanada | |
Scotford Air Liquide | Fort Saskatchewan | 106 | 2000 | Air Liquide Canada | |
Scotford Cogeneration Plant | Fort Saskatchewan | 195 | 2003 | Heartland Generation | [46] |
Sheerness Generating Station | Hanna | 800 | 1986–1990 | Heartland Generation, TransAlta | [47][48] |
Shepard Energy Centre | Calgary | 868 | 2015 | ENMAX, Capital Power | [49] |
Sturgeon Generating Plant | Valleyview | 18 | 1957–1961 | ATCO Power | [50] |
Sundance Power Station unit 4 | 53°30′27″N 114°33′26″W | 113 | 2021 | TransAlta | [9] |
Sundance Power Station unit 6 | 53°30′27″N 114°33′26″W | 401 | 2021 | TransAlta | [51] |
Three Creeks Power Plant | Peace No. 135 | 100 | 202x | Kineticor Resource Corp. | [52] |
University of Alberta Heating Plant | University of Alberta | 39.7 | 1994–2000 | University of Alberta | [53] |
University of Calgary Central Heating and Cooling Plant | University of Calgary | 12 | 2011 | University of Calgary | [54] [55] |
Valleyview 1 and 2 Generating Plants | Valleyview | 90 | 2001–2008 | Heartland Generation | [56] |
Clover Bar Generating Station Units 1-4 | Edmonton | (660) | (2005) | Capital Power | [57][58] |
Medicine Hat Gas Power Units 5 & 8 | Medicine Hat | (37) | (2009) | City of Medicine Hat | |
Rossdale Generating Station Units 8–10 | Edmonton | (209) | (2009) | Capital Power |
Dual fuel
List of all dual fuel (coal/natural gas) power plants in Alberta.
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Battle River Generating Station Unit 4 | Forestburg 52°28′08″N112°08′02″W | 155 | 1969–1981 | Heartland Generation | [59] |
Renewable
Biomass, biogas, and waste heat recovery
List of all biomass, biogas and waste heat recovery power plants in Alberta.
Name | Location | Capacity (MW) | Date | Owner | Type | Ref |
---|---|---|---|---|---|---|
Alberta Pacific Forest | Athabasca | 131 | 1993–2012 | Alberta Pacific Forest | Biomass | [60] |
Bear Creek Steam Turbine | Grande Prairie | 30 | 2002 | TransCanada | Biomass | |
Cancarb Waste Heat Recovery Plant | Medicine Hat | 42 | 2000 | Tokai Carbon Co. Ltd. | Waste heat | [61] |
Clover Bar Landfill Gas | Edmonton | 5 | 2005 | Capital Power | Biogas | [62] |
Dapp Biomass Project | Dapp | 16 | 1999 | Verdant Energy | Biomass | [63] |
Gold Creek Generation Facility | 54°49′59″N 118°39′10″W | 5 | 1999 | Maxim Power | Waste heat | [64] |
Grande Prairie Generating Station | Grande Prairie | 25 | 2005 | TransAlta | Biomass | |
Grande Prairie Pulp Mill | Grande Prairie | 48 | 2011 | Weyerhaeuser Canada | Biomass | |
East Calgary Landfill Gas to Electricity Facility | Calgary | 1 | 2023 | City of Calgary | Biogas | [65] |
Hinton Pulp Units 1 & 2 | Hinton | 50 | 1985–2011 | West Fraser Timber | Biomass | [66] |
Judy Creek ORC | Swan Hills | 2.2 | 2012 | Genalta Power | Waste Heat | [67] |
Peace River Pulp Mill | Peace River | 52 | 1990–2012 | Daishowa-Marubeni International | Biomass | [68] |
Valley Power | Drayton Valley | 12 | 1996 | Algonquin Power | Biomass | [69] |
Wheatland BioFuel Facility | Wheatland County | 1 | 2022 | Carbon Clean Energy Inc. | Biogas | [70] |
Whitecourt | Whitecourt | 25 | 1994 | Macquarie Power & Infrastructure | Biomass | [71] |
Geothermal
List of all geothermal power stations in Alberta. More than 388,500 MW of geothermal generation potential remains untapped, which is approximately 24 times Alberta's total installed generating capacity in 2019.[72]
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Greenview Geothermal Power Plant (Alberta No. 1) | Municipal District of Greenview No. 16 | 5 | 2023 | Terrapin Geothermics | [73] |
Hydroelectric
List of all hydroelectric power stations power plants in Alberta. More than 11,500 MW of hydroelectric potential remains untapped.[74]
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Amisk Hydroelectric Project | Dunvegan | 370 | 202x[note 1] | Concord Green Energy | [75][76] |
Barrier Hydroelectric Dam | Seebe | 13 | 1947 | TransAlta | [77] |
Bearspaw Hydroelectric Dam | Calgary | 17 | 1954 | TransAlta | [78] |
Belly River Hydroelectric Dam | Glenwood | 3 | 1991 | TransAlta | [79] |
Bighorn Dam | 52°18′32″N 116°19′45″W | 120 | 1972 | TransAlta | [80] |
Brazeau Hydroelectric Dam | 52°57′59″N 115°34′44″W | 355 | 1965 | TransAlta | [81] |
Cascade Hydroelectric Dam | Banff | 36 | 1942 | TransAlta | [82] |
Chin Reservoir Station | Chin | 11.4 | 1994 | Irrican Power | [83] |
Dickson Dam | 52°03′06″N 114°13′07″W | 15 | 1992 | Algonquin Power | [84] |
Drop 4, 5, and 6 Hydroelectric Plant | Raymond | 6.9 | 2004 | Irrican Power | |
Ghost Hydroelectric Dam | Cochrane | 51 | 1929 | TransAlta | [85] |
Horseshoe Hydroelectric Dam | Seebe | 14 | 1911 | TransAlta | [86] |
Interlakes Hydroelectric Dam | Kananaskis | 5 | 1955 | TransAlta | [87] |
Kananaskis Hydroelectric Dam | Seebe | 19 | 1913 | TransAlta | [88] |
Oldman River Hydroelectric Plant | Pincher Creek | 32 | 2003 | ATCO Power | [89] |
Pocaterra Hydroelectric Dam | Kananaskis | 15 | 1955 | TransAlta | [90] |
Raymond Reservoir Generating Station | Raymond | 20.5 | 1994 | Irrican Power | |
Rundle Hydroelectric Dam | Canmore | 50 | 1951 | TransAlta | [91] |
Spray Hydroelectric Dam | Canmore | 103 | 1951 | TransAlta | [92] |
St. Mary Hydroelectric Dam | Magrath | 2 | 1992 | TransAlta | [93] |
Taylor Hydroelectric Dam | Magrath | 13 | 2000 | TransAlta | [94] |
Three Sisters Hydroelectric Dam | Canmore | 3 | 1951 | TransAlta | [95] |
Waterton Hydroelectric Dam | Glenwood | 3 | 1992 | TransAlta | [96] |
Wind
List of all wind farms power stations in Alberta.
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Ardenville Wind Farm | Fort Macleod | 66 | 2010 | TransAlta | [2][97] |
Blackspring Ridge | Vulcan County | 300 | 2014 | EDF Renewables, Enbridge | [98][99] |
Blue Trail | Fort Macleod | 66 | 2009 | TransAlta | [100] |
Bull Creek | Provost | 29 | 2015 | BluEarth Renewables | [101] |
Castle River | Pincher Creek | 44 | 2000–2001 | TransAlta | [102] |
Castle Rock Wind Farm | Drumheller | 77 | 2012 | Enel | [2] |
Castle Rock Ridge 2 | Pincher Creek | 29 | 2020 | Enel Green Power | [103] |
Chin Chute | Taber | 30 | 2006 | Acciona, Enbridge, Suncor Energy | [104][105] |
Cowley North | Cowley | 20 | 2001 | TransAlta | [106] |
Ghost Pine Wind Energy Centre | Drumheller | 82 | 2010 | NextEra | [107] |
Halkirk | Halkirk | 150 | 2012 | Capital Power | [108] |
Kettles Hill | Pincher Creek | 63 | 2006–2007 | Enmax | [109] |
Macleod Flats | Fort Macleod | 3 | 2004 | TransAlta | [110] |
Magrath | Magrath | 30 | 2004 | Acciona, Enbridge, Suncor Energy | [104][105] |
McBride Lake | Fort Macleod | 75 | 2003 | Enmax, TransAlta | [111][112] |
Oldman River Wind Project | Pincher Creek | 3.6 | 2007 | Alberta Wind Energy Corporation | [113] |
Oldman 2 | Pincher Creek | 46 | 2014 | Mainstream Renewable Power | [114] |
Rattlesnake Ridge | Whitla | 130 | 2022 | Berkshire Hathaway Energy Canada | [115] |
Riverview | Pincher Creek | 105 | 2020 | Enel Green Power | [116] |
Sinnott | Cowley | 7 | 2001 | TransAlta | [117] |
Soderglen | Fort Macleod | 70.5 | 2006 | Nexen, TransAlta | [118] |
Summerview 1 | Pincher Creek | 70 | 2004 | TransAlta | [119] |
Summerview 2 | Pincher Creek | 66 | 2010 | TransAlta | [120] |
Taber Wind Farm | Taber | 80 | 2007 | Enmax | [121] |
Whitla Wind 1 | Forty Mile | 202 | 2019 | Capital Power | [122] |
Whitla Wind 2 | Forty Mile | 151 | 2021 | Capital Power | [123] |
Windrise | Fort Macleod | 206.4 | 2021 | TransAlta | [124] |
Wintering Hills Wind Farm | Drumheller | 88 | 2011 | Suncor | [125] |
Buffalo Atlee (Phase 1-4) | Special Area No. 2 | 58.4 | Q4 2022 | Capstone Infrastructure | [126] |
Cypress | Forty Mile | 248.4 | Q4 2022 | EDF Renewables | [127] |
Garden Plain | County of Paintearth No. 18 | 130 | Q4 2022 | TransAlta | [128][129] |
Forty Mile Wind Project | Forty Mile | 202.5 | Q4 2022 | Suncor | [130] |
Hand Hills | Starland County | 145 | Q4 2022 | BluEarth Renewables | [131] |
Wheatland | Wheatland County | 122.4 | Q4 2022 | Greengate Power Corporation | [132] |
Lanfine North Wind Power Project | Special Area No. 3 | 151.2 | Q4 2022 | BowArk Energy Ltd. | [133] |
Jenner Wind Project (Phase 1-3) | Special Area No. 2 | 303 | Q3 2023 | Potentia Renewables Inc. | [134] |
Grizzly Bear Wind Power Project | Minburn County No. 27 | 152 | Q4 2022 | Enel Green Power | [135] |
Hilda Wind | Cypress County | 100 | Q4 2022 | RES Canada | [136] |
Lanfine South Wind Power Project | Special Area No. 3 | 133.2 | Q4 2022 | BowArk Energy Ltd. | [137] |
Bull Trail Wind | Cypress County | 270 | Q3 2023 | EDF Renewables | [138] |
Buffalo Plains Wind Farm | Lomond | 514.6 | Q4 2023 | ABO Wind | [139] |
Sharp Hills | Special Area 3 | 297.1 | Q4 2023 | EDP Renewables | [140] |
Stirling Wind | Warner County No. 5 | 113 (Phase 1) | Q4 2023 | Greengate Power Corporation | [141] |
26 (Phase 2) | |||||
Tempest Wind Power Project | Flagstaff County | 70 | 2024 | TransAlta Renewables | [142] |
Halkirk Wind Project Phase 2 | Paintearth County No. 18 | 151 | Q4 2024 | CapitalPower | [143] |
Wild Rose 1 | Cypress County | 217 | 202x | NaturEner | [144][145] |
Wild Rose 2 | Cypress County | 192 | 202x | NaturEner | [146] |
Old Elm Wind Farm | Cardston County | 60 (Phase 1) | 202x | Alberta Wind Energy Corp. | [147] |
300 (Future) |
Solar
List of all solar power stations in Alberta.
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Alberta Solar One | Burdett | 10.5 | 2021 | Enbridge, Morgan Solar Inc | [148][149] |
Brooks Solar | Brooks | 15 | 2017 | Elemental Energy | [150] |
Brooks Solar II | Brooks | 26.5 | 2022 | Elemental Energy | [151] |
Burdett Solar | Burdett | 20 | 2021 | BluEarth Renewables | [152] |
Claresholm Solar | Claresholm | 132 | 2021 | Capstone Infrastructure | [153][154] |
Coaldale Solar | Lethbridge County | 23 | 2022 | Concord Coaldale Partnership | [155] |
Hays Solar | Hays | 23 | 2021 | Canadian Solar | [156] |
Innisfail Solar | Innisfail | 22 | 2020 | Elemental Energy | [157] |
Jenner Solar | Jenner | 23 | 2021 | Canadian Solar | [158] |
Prairie Sunlight II | Vauxhall | 25 | 2020 | Solar Krafte Utilities | [159] |
Prairie Sunlight III | Taber | 22 | 2020 | Solar Krafte Utilities | [160] |
Strathmore Solar | Strathmore | 40.5 | 2022 | Solar Krafte | [161] |
Suffield Solar | Suffield | 23 | 2020 | Suffield Solar GP Inc. | [162] |
Three Nations Energy Solar Farm | Fort Chipewyan[note 2] | 2.2 | 2020 | Three Nations Energy (joint venture) | [163] |
Yellow Lake Solar | Forty Mile | 19 | 2021 | BluEarth Renewables | [164] |
Monarch Solar | Lethbridge County | 24 | 2022 | Concord Coaldale Partnership | [165] |
East Strathmore Solar Project | Wheatland County | 20.5 | Q2 2022 | Elemental Energy | [166] |
E.L. Smith Solar Farm | Edmonton | 12 | Q2 2022 | Epcor | [167] |
Enchant Solar Project | Municipal District of Taber | 75 | Q4 2022 | Capital Power | [168] |
Prairie Sunlight I | Taber | 74.9 | Q4 2022 | Solar Krafte | [169] |
Travers Solar Project | Vulcan County | 465 | partial generation, commissioning in Q4 2022 | Greengate Power | [170] |
Wrentham Solar | Wrentham | 41.1 | Q2 2022 | Solar Krafte | [171] |
Hanna Sheerness Solar | Hanna | 13 | Q2 2022 | PACE Canada LP | [172] |
Tilley Solar | Tilley | 21 | Q2 2022 | Canadian Solar | [173] |
Caroline Solar | Caroline | 9 | Q2 2022 | PACE Canada LP | [174] |
Kneehill Solar Generation Facility | Kneehill County | 25 | Q3 2022 | Capstone Infrastructure | [175] |
Spring Coulee Solar | Spring Coulee | 29.5 | Q4 2022 | Solar Krafte | [176] |
Youngstown Solar Project | Youngstown | 6 | Q4 2022 | Pace Canada LP | [177] |
Joffre Solar | Joffre | 47 | Q4 2022 | PACE Canada LP | [178] |
Barlow Solar Park | Calgary | 27 | Q4 2022 | DP Energy | [179] |
Michichi Solar Generation Facility | Starland County | 25 | Q4 2022 | Capstone Infrastructure | [180] |
Chappice Lake Solar Storage Project | Cypress County | 15 | Q4 2022 | Elemental Energy | [181] |
Airport City Solar | Leduc | 120 | Q4 2022 | Alpin Sun | [182] |
Deerfoot Solar Park | Calgary | 35 | Q4 2022 | DP Energy | [183] |
Brooks Solar Farm | Brooks | 400 | Q4 2022 | Solar Krafte | [184] |
Lathom Solar Project | Lathom | 120 | Q4 2022 | Greengate Power | [185] |
Enterprise Solar | Vulcan | 65 | Q4 2022 | Renewable Energy Systems | [186] |
Saddlebrook Solar Project | Foothills No. 31 | 102.5 | Q4 2022 | TC Energy Corporation | [187] |
Wheatcrest Solar Project | Taber | 60 | Q1 2023 | BluEarth Renewables | [188] |
Dunmore Solar Project | Cypress County | 216 | Q2 2023 | Ascent Energy Partners | [189] |
Badger Lands Solar Farm | St. Albert | 15 | Q2 2023 | City of St. Albert | [190] |
Vauxhall Solar | Taber | 60 | Q3 2023 | Solar Krafte | [191] |
Moon Lake Solar Project | Parkland County | 24.9 | Q3 2023 | Voltarix Group | [192] |
Rocktree Solar Project | Parkland County | 22.6 | Q3 2023 | Voltarix Group | [193] |
Foothills Solar Project | Foothills County | 150 | Q4 2023 | Elemental Energy | [194] |
Creekside Solar Project | Leduc County | 24.9 | Q4 2023 | Voltarix Group | [195] |
Scottford Refinery Solar Farm | Strathcona County | 58 | Q4 2023 | Silicon Ranch | [196] |
Vulcan Solar | Vulcan County | 77 | 2023 | EDF Renewable Energy | [197] |
Saamis Solar | Taber | 300 | 202x | DP Energy | [198] |
Storage
Battery
List of all lithium-ion battery storage plants in Alberta.
Name | Location | Power Capacity (MW) | Energy Capacity (MWh) | Date | Owner | Ref |
---|---|---|---|---|---|---|
WindCharger | Pincher Creek | 10 | 20 | 2020 | TransAlta | [199] |
eReserve1 Rycroft | Spirit River | 20 | 35 | 2020 | Teric Power Ltd | [200] |
eReserve2 Buffalo Creek | Wainwright | 20 | 35 | 2021 | Teric Power Ltd | [201] |
eReserve3 | Grande Prairie | 20 | 35 | 2021 | Teric Power Ltd | [202] |
Pumped hydroelectric
List of all pumped hydroelectric storage plants in Alberta.
Name | Location | Power Capacity (MW) | Energy Capacity (MWh) | Date | Owner | Ref |
---|---|---|---|---|---|---|
Canyon Creek | Yellowhead County | 75–400[note 3] | ~2775 | 202x | Turning Point Generation, TC Energy | [203][204] |
Brazeau Hydro Pumped Storage[note 4] | 52°57′59″N 115°34′44″W | 900 | 5,000 | 2025–2026 | TransAlta | [205][206] |
Notes
- Stalled As of June 2020 yet still on track; see row references for more information (official update).
- Off-grid.
- Initially 75 MW; expandable to 400 MW.
- Pump-back expansion of existing hydroelectric dam site.
References
- Healing, Dan (2020-12-04). "Alberta set to retire coal power by 2023, ahead of 2030 provincial deadline". Global News. Retrieved 2020-12-09.
{{cite news}}
: CS1 maint: url-status (link) - Government of Alberta, "Electricity Statistics", Alberta Energy, archived from the original on 2010-08-26, retrieved 2010-08-27
- Seskus, Tony (2020-09-21). "How Alberta — yes, Alberta — could lead Canada in wind and solar by 2025". CBC News. Retrieved 2021-03-06.
{{cite news}}
: CS1 maint: url-status (link) - CapitalPower, Genesee 1 and 2, retrieved 2021-08-01
- CapitalPower, Genesee 3, retrieved 2021-08-01
- ATCO Power, Battle River Coal-Fired Generating Station, archived from the original on 2010-07-27, retrieved 2010-08-27
- TransAlta, Keephills 1, retrieved 2022-01-01
- TransAlta, Keephills 3, retrieved 2022-01-01
- "Sundance". TransAlta Power. Retrieved 2022-01-01.
- Alberta Energy Regulator, Coal Demand, retrieved 2020-10-07
- TransAlta (2010-04-01), TransAlta fully retires all units of its Wabamun power-plant, retrieved 2010-09-06
- Maxim Power Corp., Alberta Power Project (APP), retrieved 2010-08-27
- "CCGT Plants in Canada - Alberta", Power Plants Around the World, retrieved 2010-08-22
- Jones, Jeffrey (2009-06-23), "Nexen may sell gas, power marketing businesses", Reuters, retrieved 2010-08-27
- ATCO Power, Battle River Generating Station, retrieved 2021-12-05
- TransCanada, Assets, retrieved 2010-08-27
- Alberta Utilities Commission, Genalta Construction GP Ltd. - AUC.ab.ca (PDF), retrieved 2015-03-08
- The Alberta Utilities Commission (2013-05-02), Decision 2013-165 – Genalta Power Systems Inc.; 15 MW natural gas-fired power plant (PDF), retrieved 2015-03-06
- Enmax, Calgary Energy Centre, archived from the original on 2011-07-10, retrieved 2010-08-22
- The Alberta Utilities Commission (2014-06-19), DA2014-145 – Transfer of Ownership of a 15-MW Gas-Fired Turbine Power Plant (PDF), retrieved 2015-03-05
- Capital Power Corporation, Clover Bar Energy Centre, archived from the original on 2010-09-04, retrieved 2010-08-22
- Enmax, Crossfield Energy Centre, retrieved 2010-08-22
- Kineticor, Cascade Power Project, retrieved 2020-09-07
- "Empress Cogeneration Power Facility". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.
{{cite web}}
: CS1 maint: url-status (link) - TransAlta, Plants in Operation, retrieved 2012-02-28
- "Genesee Power Plant Natural Gas Conversion". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.
{{cite web}}
: CS1 maint: url-status (link) - Capital Power, Genesee Generating Station, retrieved 2021-07-10
- "Harvest Operations Gas Fired Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
{{cite web}}
: CS1 maint: url-status (link) - Heartland Petrochemical Complex, retrieved 2021-12-05
- Milner Power, H. R. Milner Generating Station, retrieved 2021-08-01
- ATCO Power, Joffre Cogeneration Plant, archived from the original on 2010-07-27, retrieved 2010-08-21
- The Alberta Utilities Commission (2014-06-20), DA2014-146 – Transfer of Ownership of 15-MW Gas-fired Power Plant (PDF), retrieved 2015-03-05
- TransAlta, SemCAMS Cogeneration Project, retrieved 2020-09-07
- AESO, Keephills Generating Station 2, retrieved 2021-08-01
- TransAlta, Keephills Generating Station 2, retrieved 2021-08-01
- TransAlta, Keephills 3, retrieved 2022-01-01
- ATCO Power, Muskeg River Cogeneration Plant, retrieved 2010-08-27
- SaskPower, Cogeneration Stations, retrieved 2010-10-09
- Constellation Energy, Northern Prairie Power Project – Project Description (PDF), retrieved 2010-08-27
- Genaltapower, Genalta Power and Baytex Energy announce activation of first phase in 20MW gas conservation power project, retrieved 2015-03-05
- Genalta Power
- ATCO Power, Poplar Hill Generating Plant, archived from the original on 2009-02-07, retrieved 2010-08-21
- ATCO Power, Primerose Cogeneration Plant, retrieved 2010-08-21
- ATCO Power, Rainbow Lake Generating Station 1, 2 and 3, retrieved 2010-08-21
- ATCO Power, Rainbow Lake Generating Station 4 and 5, retrieved 2010-08-21
- ATCO Power, Scotford Cogeneration Plant, retrieved 2010-08-21
- AESO, Sheerness Generating Station, retrieved 2021-08-01
- gem.wiki, Sheerness Generating Station, retrieved 2021-08-01
- ENMAX, Shepard Energy Centre, retrieved 2015-09-16
- ATCO Power, Sturgeon Generating Plant, retrieved 2010-08-21
- "Sundance Coal to Gas". TransAlta Power. Retrieved 2021-02-25.
- "Three Creeks Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
{{cite web}}
: CS1 maint: url-status (link) - University of Alberta, Heating Plant, retrieved 2011-09-26
- University of Calgary, Central Heating and Cooling Plant, retrieved 2019-05-24
- University of Calgary, New U of C power plant will slash emissions, retrieved 2019-05-24
- ATCO Power, Valleyview 1 and 2 Generating Plants, retrieved 2010-08-21
- "Gas- and Oil-Fired Plants in Canada", Power Plants Around the World, archived from the original on 2009-07-19, retrieved 2010-08-22
- Capital Power Corporation (2005-07-28), EPCOR to Decommission Clover Bar Generating Station, retrieved 2010-08-27
- ATCO Power, Battle River Coal-Fired Generating Station, archived from the original on 2010-07-27, retrieved 2010-08-27
- Alberta Pacific Forest, Chemical Recovery & Utilities, retrieved 2010-08-27
- "Cancarb Sold: Medicine Hat Facility Purchased By Japanese Firm For $190 Million". HuffPost Canada. Retrieved 2017-07-07.
- Capital Power Corporation, Clover Bar Landfill Gas, retrieved 2010-08-27
- Verdant Energy, Dapp Biomass Project, retrieved 2010-08-27
- Maxim Power Corp., Gold Creek, Alberta, retrieved 2010-08-27
- Alberta Major Projects, East Calgary Landfill Gas to Electricity Facility, retrieved 2021-12-10
- DNatural Resources Canada, Government of Canada Investing in Environmental Improvements at Hinton Pulp Mill, retrieved 2012-10-16
- Genaltapower, Genalta Power Aggravated heat recovery, retrieved 2015-03-06
- Daishowa-Marubeni International Ltd, Green Power Enhancement Project, retrieved 2012-10-16
- Algonquin Power, Valley Power, retrieved 2010-08-22
- Alberta Major Projects, Project Wheatland BioFuel Facility, retrieved 2021-12-10
- Macquarie Power & Infrastructure Income Fund, Whitecourt, retrieved 2010-08-22
- Duncanson, Sander; Kennedy, Jessica; Baker, Jesse (2020-11-02). "Alberta government introduces Bill 36: The Geothermal Resource Development Act". Osler, Hoskin & Harcourt. Retrieved 2021-02-06.
{{cite web}}
: CS1 maint: url-status (link) - "Greenview Geothermal Power Plant (Alberta No. 1)". Alberta Major Projects. Retrieved 2021-01-12.
{{cite web}}
: CS1 maint: url-status (link) - "Hydroelectricity in Alberta Today - Electricity & Alternative Energy - Alberta's Energy Heritage". www.history.alberta.ca. Retrieved 2021-02-06.
- "Home". AMISK Hydroelectric Project. Retrieved 2021-01-02.
- Berrade, David (2020-06-09). "Amisk Hydroelectric Project Update" (PDF).
{{cite web}}
: CS1 maint: url-status (link) - TransAlta, Barrier Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, Bearspaw Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, Belly River Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, Bighorn Dam, retrieved 2021-08-01
- TransAlta, Brazeau Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, Cascade Hydroelectric Dam, retrieved 2021-08-01
- "IRRICAN POWER GENERAL OVERVIEW" (PDF). St. Mary River Irrigation District. Archived from the original (PDF) on 2012-03-11. Retrieved 2010-08-27.
- Algonquin Power, Dickson Dam, retrieved 2010-08-25
- TransAlta, Ghost Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, Horseshoe Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, Interlakes Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, Kananaskis Hydroelectric Dam, retrieved 2021-08-01
- ATCO Power, Oldman River Hydroelectric Plant, retrieved 2010-08-25
- TransAlta, Pocaterra Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, Rundle Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, Spray Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, St. Mary Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, Taylor Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, Three Sisters Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, Waterton Hydroelectric Dam, retrieved 2021-08-01
- TransAlta, Ardenville, retrieved 2012-10-02
- EDF Renewables, Blackspring Ridge Wind, retrieved 2020-09-06
- Enbridge, Blackspring Ridge, retrieved 2020-09-06
- TransAlta, Blue Trail, retrieved 2010-08-23
- BluEarth Renewables, Bull Creek Wind, retrieved 2020-09-06
- TransAlta, Castle River, retrieved 2010-08-22
- Enel Green Power, Castle Rock Ridge 2, retrieved 2020-09-06
- Acciona Energía, Own facilities, archived from the original on 2009-01-14, retrieved 2010-08-22
- Suncor Energy, Wind Energy, retrieved 2010-08-22
- TransAlta, Cowley North, retrieved 2010-08-22
- NextEra Energy, Ghost Pine Wind Energy Centre Fact Sheet (PDF), retrieved 2012-10-02
- Capital Power, Halkirk Wind Project, retrieved 2012-10-04
- Enmax, Kettle Hills Wind Farm, retrieved 2010-08-22
- TransAlta, Macleod Flats, retrieved 2010-08-22
- TransAlta, McBride Lake, retrieved 2010-08-22
- Enmax, McBride Lake Wind Farm, archived from the original on 2010-07-13, retrieved 2010-08-22
- Alberta Wind Energy Corporation, Projects, archived from the original on 2010-04-21, retrieved 2010-08-23
- Mainstream RP, Oldman Wind Plant, retrieved 2010-08-22
- Berkshire Hathaway Energy Canada, Rattlesnake Ridge Wind Project, retrieved 2022-02-27
- Enel Green Power, Riverview, retrieved 2010-08-22
- TransAlta, Sinnott, retrieved 2010-08-22
- TransAlta, Soderglen, retrieved 2010-08-22
- TransAlta, Summerview, retrieved 2010-08-22
- TransAlta, Summerview 2, retrieved 2010-08-22
- Enmax, Taber Wind Farm, retrieved 2010-08-22
- Capital Power, Whitla Wind, retrieved 2020-09-06
- Capital Power, Whitla Wind 2, retrieved 2020-09-07
- TransAlta, Windrise, retrieved 2020-11-29
- Suncor Energy, Wind Power, retrieved 2012-10-02
- Buffalo Atlee, Buffalo Atlee (Phase 1-4), retrieved 2021-06-05
- EDF Renewables, Cypress Wind Power Project, retrieved 2021-05-08
- TransAlta, Garden Plain Wind Projet, retrieved 2021-04-11
- Alberta Major Projects, Garden Plain Wind Project, retrieved 2021-06-05
- Suncor Energy, Forty Mile Wind Power Project, retrieved 2021-12-10
- BluEarth Renewables, Hand Hills Wind Project, retrieved 2021-12-10
- Greengate Power Corporation, Wheatland Wind Project, retrieved 2020-09-07
- Lanfine Wind Power Project, Lanfine Wind Power Project, retrieved 2021-07-05
- Jenner Wind Project, Jenner Wind Project (Phase 1-3), retrieved 2021-06-05
- Grizzly Bear Wind Power Project, Grizzly Bear Wind Power Project, retrieved 2021-07-05
- RES Canada, Hilda Wind, retrieved 2021-12-10
- Lanfine Wind Power Project, Lanfine Wind Power Project, retrieved 2021-07-05
- EDF Renewables, Bull Trail Wind, retrieved 2020-11-29
- "Buffalo Plains Wind Farm". ABO Wind. Retrieved 2021-01-25.
{{cite web}}
: CS1 maint: url-status (link) - EDP Renewables, Sharp Hills Wind Farm, retrieved 2021-08-20
- Stirling Wind, Stirling-Wind, retrieved 2021-10-07
- Major Projects Alberta, Tempest Wind Power Project, retrieved 2021-06-05
- CapitalPower, Halkirk Wind Project Phase 2, retrieved 2021-12-10
- Alberta Major Projects, Wild Rose 1 Wind Farm, retrieved 2021-04-11
- Alberta Utilities Commission, Wild Rose 1 Wind Power Project Time Extension (PDF), retrieved 2021-04-11
- Alberta Utilities Commission, Wild Rose 2 Wind Power Project Time Extension (PDF), retrieved 2021-04-11
- "Old Elm Wind Farm". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
{{cite web}}
: CS1 maint: url-status (link) - Enbridge, Alberta Solar One Project, retrieved 2021-02-25
- Morgan Solar Inc, Alberta Solar One, retrieved 2021-02-25
- Elemental Energy, Brooks Solar, retrieved 2020-09-01
- Elemental Energy, Brooks Solar II, retrieved 2020-09-07
- BluEarth Renewables, Burdett Solar Project, retrieved 2020-09-01
- AESO, New Assets Claresholm (CLR1 and CLR2) Notice, retrieved 2021-01-26
- Capstone Infrastructure, Claresholm, retrieved 2021-02-25
- AESO, Coaldale Solar, retrieved 2022-04-18
- Canadian Solar, Hays Solar Project, retrieved 2020-11-29
- Elemental Energy, Innisfail Solar, retrieved 2020-09-01
- Canadian Solar, Jenner Solar Project, retrieved 2020-11-29
- Solar Krafte Utilities, Prairie Sunlight II, retrieved 2020-09-01
- Solar Krafte Utilities, Prairie Sunlight III, retrieved 2020-09-01
- Solar Krafte, Strathmore Solar Farm, retrieved 2020-09-07
- Suffield Solar GP Inc, Suffield Solar (PDF), retrieved 2020-09-01
- Omstead, Jordan (2020-11-19). "Indigenous-owned solar farm opens in remote northern Alberta community". CBC. Retrieved 2020-11-29.
{{cite news}}
: CS1 maint: url-status (link) - BluEarth Renewables, Yellow Lake Solar Project, retrieved 2020-09-07
- AESO, Monarch Solar, retrieved 2022-04-18
- Elemental Energy, East Strathmore Solar Project, retrieved 2021-08-13
- Epcor, E.L. Smith Solar Farm, retrieved 2020-09-07
- "Enchant Solar Project". Enchant Solar Project. Retrieved 2021-12-10.
- Solar Krafte, Prairie Sunlight I, retrieved 2020-09-07
- Greengate Power, Travers Solar, retrieved 2021-08-13
- Solar Krafte, Wrentham Solar Project, retrieved 2020-09-07
- PACE Canada LP, Hanna Sheerness Solar - 13 MW, retrieved 2020-11-29
- Canadian Solar, Tilley Solar Project, retrieved 2021-08-13
- PACE Canada LP, Caroline Solar - 9 MW, retrieved 2020-11-29
- "Kneehill Solar Capstone Infrastructure". Retrieved 2021-07-05.
- Solar Krafte, Spring Coulee Solar Project, retrieved 2020-09-07
- "Youngstown Solar Project". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
{{cite web}}
: CS1 maint: url-status (link) - PACE Canada LP, Joffre Solar - 47 MW, retrieved 2020-11-29
- DP Energy, Barlow Solar Park, retrieved 2020-09-07
- "Michichi Solar Capstone Infrastructure". Retrieved 2021-07-05.
- "Chappice Lake Solar Storage Project". Elemental Energy. Retrieved 2021-12-10.
{{cite web}}
: CS1 maint: url-status (link) - EIA, World’s-largest airport solar farm arriving at EIA, retrieved 2020-09-07
- DP Energy, Deerfoot Solar Park, retrieved 2020-09-07
- Solar Krafte, Brooks Solar Farm, retrieved 2021-04-11
- Lathom Solar Project, Lathom Solar Project, retrieved 2021-05-12
- "Enterprise Solar Project". www.enterprise-solar.com. Retrieved 2021-12-10.
- "Saddlebrook Solar and Storage Project". TC Energy. Retrieved 2021-07-27.
{{cite web}}
: CS1 maint: url-status (link) - "BluEarth Renewables". Retrieved 2021-12-10.
{{cite web}}
: CS1 maint: url-status (link) - "Dunmore Solar Project". Dunmore Solar Project. Retrieved 2021-12-10.
- "Badger Lands Solar Farm". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-05.
{{cite web}}
: CS1 maint: url-status (link) - Solar Krafte, Vauxhall Solar Farm, retrieved 2021-12-10
- Voltarix Group, Moon Lake Solar Project, retrieved 2021-12-10
- Voltarix Group, Rocktree Solar Project, retrieved 2021-12-10
- Elemental Energy, Foothills Solar Project, retrieved 2022-04-18
- Voltarix Group, Creekside Solar Project, retrieved 2021-12-10
- CBC Canada, Scottford Refinery Solar Farm, retrieved 2021-12-10
- EDF Renewable Energy, Vulcan Solar, retrieved 2020-09-07
- DP Energy, Saamis Solar, retrieved 2021-12-10
- TransAlta, WindCharger Battery Storage, retrieved 2020-09-06
- Teric Power Ltd, eReserve1, retrieved 2020-11-29
- Teric Power Ltd, eReserve2, retrieved 2020-11-29
- Teric Power Ltd, eReserve3, retrieved 2020-11-29
- Turning Point Generation, The Canyon Creek Project, retrieved 2020-11-29
- Masha Scheele, Canyon Creek Project eyes 2021 build, retrieved 2020-11-29
- "Management's Discussion and Analysis" (PDF). TransAlta. March 2019. p. 1. Retrieved 2020-02-06.
{{cite web}}
: CS1 maint: url-status (link) - "TransAlta Renewables Inc. Investor Presentation" (PDF). TransAlta Renewables. March 2018. pp. 19–22. Retrieved 2021-02-06.
{{cite web}}
: CS1 maint: url-status (link) - Shumkov, Ivan (2021-06-18). "Quidnet Energy plans multi-gigawatt geologic storage project in Alberta". Renewables Now. Retrieved 2021-07-22.