Line D5 (Moscow Central Diameters)
D5 (Russian: МЦД-5) or Yaroslavsko–Paveletsky Diameter (Russian: Ярославско-Павелецкий диаметр) is the fifth line of the Moscow Central Diameters which will open in 2024.[1][2]
Yaroslavsko–Paveletsky Diameter | |
---|---|
![]() | |
Overview | |
Native name | Ярославско-Павелецкий диаметр |
Status | Planned |
Owner | Government of Russia |
Locale | Moscow |
Termini | Pushkino Domodedovo |
Stations | 34 |
Service | |
Type | Commuter rail |
System | Moscow Central Diameters |
Operator(s) | Central Suburban Passenger Company |
History | |
Planned opening | 2024 |
Technical | |
Line length | 72 km (45 mi) |
Track gauge | 1,520 mm (4 ft 11+27⁄32 in) Russian gauge |
Stations
Station Name | Transfers | |
---|---|---|
English | Russian | |
Pushkino | Пушкино | |
Mamontovskaya | Мамонтовская | |
Klyazma | Клязьма | |
Tarasovskaya | Тарасовская | |
Chelyuskinskaya | Челюскинская | |
Stroitel | Строитель | |
Mytishchi | Мытищи | |
Tayninskaya | Тайнинская | |
Perlovskaya | Перловская | |
Los | Лось | |
Losinoostrovskaya | Лосиноостровская | |
Rostokino | Ростокино | ![]() |
Yauza | Яуза | |
Malenkovskaya | Маленковская | |
Moskva-3 | Москва III | |
Mitkovo | Митьково | ![]() ![]() ![]() |
Elektrozavodskaya | Электрозаводская | ![]() ![]() ![]() |
Vladimirsky Puteprovod | Владимирский путепровод | |
Andronovka | Андроновка | ![]() ![]() |
Chukhlinka | Чухлинка | ![]() ![]() |
Stakhanovskaya | Стахановская | ![]() |
Grayvoronovo | Грайвороново | |
Novokhokhlovskaya | Новохохловская | ![]() ![]() |
Tekstilshchiki | Текстильщики | ![]() ![]() ![]() |
Pechatniki | Печатники | ![]() ![]() ![]() |
Kubanskaya | Кубанская | ![]() |
Depo | Депо | ![]() |
Pererva | Перерва | ![]() |
Kuryanovo | Курьяново | ![]() |
Moskvorechye | Москворечье | ![]() |
Tsaritsyno | Царицыно | ![]() ![]() |
Kotlyakovo | Котляково | ![]() |
Biryulyovo-Tovarnaya | Бирюлёво-Товарная | |
Biryulyovo-Passazhirskaya | Бирюлёво-Пассажирская | |
Bulatnikovo | Булатниково | |
Rastorguyevo | Расторгуево | |
Kalinina | Калинина | |
Leninskaya | Ленинская | |
32 km | 32 км | |
Domodedovo | Домодедово | |
Alternative routes
The suggested route would increase load on the already heavily used Mitkovo-Kotlyakovo section, while bypassing such important hubs as Komsomolskaya, Paveletskaya and Tulskaya. It has been suggested to connect Yaroslavskiy and Paveletskiy rail terminals with an underground tunnel and keep D5 entirely on the existing Yaroslavsky and Paveletsky suburban lines. The estimated cost is tens to hundreds billion roubles (up to several billion dollars).[3] It is possible that MCD-5 will be launched as two disjointed sections: Pushkino-Yaroslavskiy and Paveletskiy-Domodedovo and the tunnel would be constructed by 2035 or later.
Another suggestion is to connect Yaroslavsky and Paveletsky lines through railroads of western Moscow. This route is longer, but with less traffic. The final decision will be made after 2024.[4]
Regardless of the connection inside Moscow, the northern part is likely to also include Mytischi-Bolshevo section of Mytischi-Fryazevo branch line, connecting the city Korolyov to MCD-5. The upgrading of the railroad is underway.[5]
References
- "Хуснуллин: утверждена программа развития МЦД до 2025 года" (in Russian). stroi.mos.ru. Retrieved 2019-09-01.
- bender (2019-06-01). "МЦД 5 схема станций" (in Russian). 10faktov.ru. Retrieved 2019-09-01.
- "Глубокий тоннель потребуется построить в центре Москвы для запуска МЦД-5" (in Russian). Interfax. Retrieved 2021-11-25.
- "Проект МЦД-5 разработан, но будет окончательно утвержден после 2024 года" (in Russian). TASS. Retrieved 2022-02-28.
- "Быстро, комфортно, качественно. Когда запустят движение на МЦД?" (in Russian). 360tv.ru. Retrieved 2022-02-28.