Line 1 (Hangzhou Metro)

Line 1 of the Hangzhou Metro (Chinese: 杭州地铁一号线; pinyin: Hángzhōu Dìtiě Yī Hào Xiàn) is an arc-shaped rapid transit line running from Xianghu station in western Xiaoshan District to Xiaoshan International Airport in eastern Xiaoshan District, passing through downtown Hangzhou. Opening on 24 November 2012, it is the oldest in the city's metro network.[2]

Line 1
 1 
Overview
StatusOperational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
TerminiXianghu
Xiaoshan International Airport
Stations33
Service
TypeRapid transit
SystemHangzhou Metro
Services2
Operator(s)Hangzhou MTR Corporation Limited
Depot(s)Qibao Depot
Xianghu Stabling Yard
Nanyang Stabling Yard
Rolling stock6 cars, type B
Daily ridership520,000 (2016 Daily Avg.)[1]
1,270,300 (2019-05-01 peak)
History
Opened24 November 2012 (2012-11-24)
Technical
Line length52.21 km (32.44 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead line, 1500 V DC
Operating speed80 km/h (50 mph)
Route map

Xianghu Yard
1
Xianghu
2
Binkang Road
 5 
Line 5  Guniangqiao  Yuhang Town 
3
Xixing
4
Binhe Road
5
Jiangling Road
 6 
6
Jinjiang
 4 
7
Wujiang Road
Moyetang
8
Chengzhan
 5   7  HZH
Line 5  Yuhang Town  Guniangqiao 
9
Ding'an Road
10
Longxiangqiao
Line 2 interconnection
11
Fengqi Road
 2 
Line 3 Wushanqian / Shima
12
Wulin Square
 3 
13
West Lake Cultural Square
 3   19 
14
Datieguan
 5 
Line 5  Guniangqiao  Yuhang Town 
CR interconnection
Airport Express crossing
15
Zhalongkou
16
East Railway Station
 4   19  HGH
17
Pengbu
 4 
18
Qibao and Qibao Depot
19
Jiuhe Road
20
Jiubao
Line 9 Guanyintang
21
Coach Center
 9 
Line 9 Long'an
22
West Xiasha
23
Jinshahu
24
Gaosha Road
25
Wenze Road
26
South Wenhai Road
 8 
27
Yunshui
28
Xiasha Jiangbin
29
Hangzhou Grand Convention and Exhibition Center
30
Gangcheng Avenue
31
Nanyang
Nanyang Yard
32
Xiangyang Road
33
Xiaoshan International Airport
 7   19 

The line is 52 km (32 mi) long with 33 stations.

Opening timeline

SegmentCommencementLengthStation(s)Name
Xianghu — Wenze Road 24 November 2012 34.82 km (21.64 mi) 24 Phase 1
Coach Center — Linping[lower-alpha 1] 12.5 km (7.77 mi)[4] 6
East Railway Station 30 June 2013 Infill station 1
Wenze Road — Xiasha Jiangbin 24 November 2015 5.7 km (3.54 mi) 3 Phase 2
Xiasha Jiangbin — Xiaoshan International Airport 30 December 2020 11.2 km (6.96 mi)[5] 5 Phase 3
  1. The branch line (Coach CenterLinping) is operated as Line 9 since 10 July 2021.[3]

Service routes

Stations

Station name Connections Distance
km
Location
English Chinese
Xianghu 湘湖 0.00 0.00 Xiaoshan
Binkang Road 滨康路  5  2.10 2.10 Binjiang
Xixing 西兴 1.02 3.12
Binhe Road 滨和路 1.50 4.62
Jiangling Road 江陵路  6  1.05 5.67
Jinjiang 近江  4  3.10 8.77 Shangcheng
Wujiang Road 婺江路 0.87 9.64
Chengzhan 城站  5  HZH 1.27 10.91
Ding'an Road 定安路 1.30 12.21
Longxiangqiao 龙翔桥 1.20 13.41
Fengqi Road 凤起路  2  0.80 14.21 Gongshu
Wulin Square 武林广场  3  Hangzhou BRT 1.13 15.34
West Lake Cultural Square 西湖文化广场  3   Airport  0.87 16.21
Datieguan 打铁关  5  1.43 17.64
Zhalongkou 闸弄口 1.46 19.10 Shangcheng
East Railway Station 火车东站  4   6 [lower-alpha 1]  Airport  HGH 2.16 21.26
Pengbu 彭埠  4  1.10 22.36
Qibao 七堡 1.80 24.16
Jiuhe Road 九和路 1.20 25.36
Jiubao 九堡 1.45 26.81
Coach Center 客运中心  9  1.26 28.07
West Xiasha 下沙西 3.25 31.32 Qiantang
Jinshahu 金沙湖 1.27 32.59
Gaosha Road 高沙路 0.93 33.52
Wenze Road 文泽路 1.25 34.77
South Wenhai Road 文海南路  8  2.70 37.47
Yunshui 云水 1.40 38.87
Xiasha Jiangbin 下沙江滨 1.65 40.52
Hangzhou Grand Convention and Exhibition Center 杭州大会展中心 3.97 44.49 Xiaoshan
Gangcheng Avenue 港城大道 1.28 45.77
Nanyang 南阳 1.00 46.77
Xiangyang Road 向阳路 1.60 48.37
Xiaoshan International Airport 萧山国际机场  7   Airport  HGH 3.84 52.21
To scale map of Hangzhou Metro Line 1

See also

Notes

  1. Out-of-station interchange with East Railway Station (East Square)

References

  1. http://hznews.hangzhou.com.cn/chengshi/content/2016-06/17/content_6217552.htm
  2. "Archived copy" 杭州地铁1号线下沙延伸段24日通车 1号线有新变化. 杭州网. 23 November 2015. Archived from the original on 24 November 2015.{{cite web}}: CS1 maint: archived copy as title (link)
  3. "7月10日起,杭州地铁9号线来了!". 7 July 2021.
  4. "喜讯!众合科技助力杭州地铁9号线临平段改造工程圆满完成". 15 July 2021. 为9号线的中段,由既有1号线临平支线拆分独立运营构成,长约12.5公里
  5. "杭州地铁四段新线齐开 可以坐着地铁去机场了". 31 December 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.