Green Line (Hyderabad Metro)

The Green is a part of the Hyderabad Metro system in Telangana, India. The line is 16.6 km and spans 15 stations from JBS Parade Ground to Falaknuma. It was funded by a public–private partnership (PPP),[2][3] with the state government holding a minority equity stake.[4] A special purpose vehicle company, L&T Metro Rail Hyderabad Ltd (L&TMRHL), was established by the construction company Larsen & Toubro (L&T)[5][6] to develop the Hyderabad Metro rail project.[7][8]

Green Line
Overview
Owner
LocaleHyderabad, Telangana, India
TerminiJBS Parade Ground
Falaknuma
Stations15
Service
TypeMetro
SystemHyderabad Metro
Operator(s)Hyderabad Metro Rail Ltd. (HMRL)
Depot(s)Falaknuma
Rolling stockHyundai Rotem
History
Opened8 February 2020 (2020-02-08)[1]
Technical
Line length16.6 km (10.3 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV, AC Overhead catenary
Operating speed80 km/h (50 mph)

An 11-kilometre (6.8 mi) stretch of the Green Line from JBS Parade Ground to MG Bus Station, with 9 stations, was inaugurated on 7 February 2020 by Telangana Chief Minister K. Chandrasekhar Rao,[9] and opened to the public the next day.[1] A 5.6 km southward extension from MG Bus Station to Falaknuma is yet to be completed in the Old City.[1]

Construction

Green Line sections were opened as indicated below.

Green Line
Stage Extension date Terminal Stations Length Stations
18 February 2020JBS Parade GroundMG Bus Station11 km (6.8 mi)9
2MG Bus StationFalaknuma5.6 km (3.5 mi)6
TotalJBS Parade GroundFalaknuma16.6 km (10.3 mi)15

Stations

# Station Name Opened Connections Alignment
1JBS Parade Ground8 February 2020Blue LineElevated
2Secunderabad West8 February 2020NoneElevated
3Gandhi Hospital8 February 2020NoneElevated
4Musheerabad8 February 2020NoneElevated
5R.T.C. Cross Roads8 February 2020NoneElevated
6Chikkadpally8 February 2020NoneElevated
7Narayanguda8 February 2020NoneElevated
8Sultan Bazaar8 February 2020NoneElevated
9M.G. Bus Station8 February 2020Red LineElevated
10Salarjung MuseumNoneElevated
11CharminarNoneElevated
12Shah-Ali-BandaNoneElevated
13ShamsherganjNoneElevated
14JungamettaNoneElevated
15FalaknumaNoneElevated

References

  1. Smith, Kevin (10 February 2020). "Hyderabad Metro opens Green Line". International Railway Journal. Retrieved 28 November 2021.
  2. "Skywalks to connect Metro with schools & malls: NVS Reddy | Hyderabad News - Times of India". The Times of India.
  3. Sood, Jyotika (26 July 2017). "How metro rail networks are spreading across India". Livemint.
  4. "EPC vs PPP in metro rail". Projectsmonitor.com. 2 December 2007. Archived from the original on 2 December 2007. Retrieved 18 April 2013.
  5. "The Next Station Is... | Outlook India Magazine". outlookindia.com/.
  6. Kumar, V. Rishi. "Eyeing non-fare revenues, L&T Metro Hyderabad takes up transit oriented development". @businessline.
  7. "N.V.S. Reddy to be AP Govt nominee on L&T Metro Rail board". @businessline.
  8. "Hyderabad metro on tricky track, running on losses | Hyderabad News - Times of India". The Times of India.
  9. "K Chandrasekhar Rao: Telangana CM to inaugurate 11-km stretch of Hyderabad Metro on February 7". The Times of India. Retrieved 28 November 2021.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.