East–West Corridor (Ahmedabad Metro)
The East-West Corridor of the Ahmedabad Metro is the first metro line of the Ahmedabad city's mass rapid transit rail. It consists of 6 operational metro stations, starting from Vastral Gam and ending in Apparel Park, with a total distance of 6.5 km (4.0 mi). The 14.73 km (9.15 mi) stretch from Apparel Park to Thaltej Gam is currently under construction. Upon completion, the line will span 21.23 km (13.19 mi), with most of the it being elevated.
East-West Corridor | |
---|---|
Overview | |
Status | Operational |
Locale | Ahmedabad |
Termini | Thaltej Gam Vastral Gam |
Stations | 18 6 (operational) |
Service | |
Type | Rapid Transit |
System | Ahmedabad Metro |
Operator(s) | Gujarat Metro Rail Corporation Limited |
Rolling stock | Hyundai Rotem |
History | |
Opened | 4 March 2019 |
Technical | |
Line length | 6.5 km[1] |
Character | Elevated & Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) (Standard gauge) |
Electrification | 750V DC Third Rail |
While connecitng Vastral Gam to Thaltej Gam, this line will be passing through Nirant Cross Road, Vastral, Rabari Colony, Amraiwadi, Apparel Park, Kankaria East, Kalupur Railway Station, Ghee Kanta, Shahpur, Old High Court, Stadium, Commerce Six Road, Gujarat University, Gurukul Road, Doordarshan Kendra, Thaltej stations.
The underground section is approximately 6.5 km in length with 4 underground stations, while the elevated section has 13 elevated stations. Old High Court station will serve as an interchange station for the East-West corridor and North-South corridor.
Partial commercial operation of Phase-1 from Vastral Gam to Apparel Park on blue line was inaugurated on 4 March 2019 by the Prime Minister of India Narendra Modi along with Chief Minister of Gujarat Vijay Rupani & Deputy Chief Minister of Gujarat Nitinbhai Patel.[2]
List of stations
Following is a list of stations on this route-
East-West Corridor | |||||||
---|---|---|---|---|---|---|---|
# | Station Name | Opened | Connections | Layout | |||
English | Gujarati | ||||||
1 | Thaltej Gam | થલતેજ ગામ | Under Construction | None | Elevated | ||
2 | Thaltej | થલતેજ | Under Construction | None | Elevated | ||
3 | Doordarshan Kendra | દૂરદર્શન કેન્દ્ર | Under Construction | None | Elevated | ||
4 | Gurukul Road | ગુરુકુળ રોડ | Under Construction | None | Elevated | ||
5 | Gujarat University | ગુજરાત યુનિવર્સિટી | Under Construction | None | Elevated | ||
6 | Commerce Six Road | કોમર્સ છ રસ્તા | Under Construction | None | Elevated | ||
7 | Stadium (Ahmedabad) | સ્ટેડિયમ | Under Construction | None | Elevated | ||
8 | Old High Court | જૂની હાઇ કોર્ટ | Under Construction | North-South Corridor | Elevated | ||
9 | Shahpur | શાહપુર | Under Construction | None | Underground | ||
10 | Gheekanta | ઘીકાંટા | Under Construction | None | Underground | ||
11 | Kalupur Railway Station | કાલુપુર રેલ્વે સ્ટેશન | Under Construction | None | Underground | ||
12 | Kankaria East | કાંકરિયા પૂર્વ | Under Construction | None | Underground | ||
13 | Apparel Park | એપેરલ પાર્ક | March 4, 2019 | None | Elevated | ||
14 | Amraiwadi | અમરાઈવાડી | March 4, 2019 | None | Elevated | ||
15 | Rabari Colony | રબારી કોલોની | March 4, 2019 | None | Elevated | ||
16 | Vastral | વસ્ત્રાલ | March 4, 2019 | None | Elevated | ||
17 | Nirant Cross Road | નિરાંત ક્રોસ રોડ | March 4, 2019 | None | Elevated | ||
18 | Vastral Gam | વસ્ત્રાલ ગામ | March 4, 2019 | None | Elevated | ||
Construction
The Gujarat Metro Rail Corporation (GMRC) Limited has divided the construction work of the 20.73 km long East-West Corridor of Ahmedabad Metro into multiple construction packages.
The list of contractors is as follows:
Sr. No | Package | No. of Stations | Contractor |
---|---|---|---|
1. | Vastral Gam – Apparel Park | Viaduct only | J. Kumar Infraprojects |
2. | Vastral Gam – Apparel Park | 6 | DRA Infracon-CICO JV |
3. | Apparel Park Depot | Depot only | URC Construction |
4. | Kalupur – West Ramp | 2 | Larsen and Toubro |
5. | Thaltej – Thaltej Gam | 2 | DRA Infracon[3] |
6. | East Ramp – Kalupur | 2 | Afcons Infrastructure |
References
- "PM Modi inaugurates Ahmedabad Metro first phase, takes a ride". Economic Times. 4 March 2019.
- "PM Narendra Modi inaugurates Ahmedabad Metro first phase, takes a ride". Mint. 4 March 2019. Retrieved 8 March 2019.
- "DRA Infracon wins Ahmedabad Metro's Thaltej Gam section". The Metro Rail Guy. 17 December 2017.