January 1 – First phase of the Lusail Tram, a six-station section of the Orange Line, opens.[1]
January 8 – Hangzhou–Taizhou high-speed railway opens.[2]
January 13 – Line 4 of the Paris Métro is extended from Mairie de Montrouge to Bagneux–Lucie Aubrac.[3]
January 15 – Second phase of the Jiaxing Tram begins operation.
January 25 – The first phase of Line 9 of the Chongqing Rail Transit opens between Gaotanyan and Xingke Avenue.[4]
February
February 16 – Opening of Line 2 extension of the Rabat–Salé tramway.[5]
February 21 – The first phases of Lines 3 and 10 of the Hangzhou Metro open, and Line 4 is extended from Pengbu to Chihua Street.
March
March 6 – The Pune Metro starts operations between PCMC Bhavan and Phugewadi on the Purple Line, and between Vanaz and Garware College on the Aqua Line.
- March 19
– Line 4 of the Seoul Metropolitan Subway is extended from Danggogae to Jinjeop.[6][7]
– The 75 kilometer 'Beno' rail line between Belgrade and Novi Sad in Serbia is reopened as a high speed line, part of the Budapest–Belgrade railway, partly under the Chinese Belt and Road Initiative.[8]
March 21 – The Union Square Branch of the MBTA subway's Green Line Extension opens in Somerville.[9]
March 22 – Manila MRT Line 3 completes an upgrading and rehabilitation project.[10]
- March 25
– Construction of the Moscow–Saint Petersburg high-speed railway is suspended.[11]
– The Bilbao tram is extended from Atxuri to Bolueta using the former Euskotren Trena alignment between Kukullaga and Atxuri.[12]
March 28 – Allegro international high-speed service ends operations.[13]
March 29 – Punjabi Bagh West station on the Delhi Metro becomes an interchange between the Pink Line and the Green Line.[14][15]
March 30 – Guiyang railway loop line opens.[16]
- March 31
– The first phase of Line 22 of the Guangzhou Metro opens from Panyu Square to Chentougang.[17]
– The Krasnodar tramway is extended from Solnechnaya to Ulitsa Petra Metalnikova.[18]
April
- April 1
– Line 7 of the Hangzhou Metro is extended from Citizen Center to Wushan Square, and Line 9 is extended from Coach Center to Guanyintang.[19]
– ScotRail takes over from Abellio ScotRail as operator of last resort of the ScotRail franchise.[20]
April 2 – The first phases of Lines 2 and 7 of the Mumbai Metro open.[21]
April 9 – Line 5 of the Prague tram network is extended from Sídliště Barrandov to Holyně.[22]
April 23 – Line 10 of the Poznań tram network is extended from Lechicka/Naramowicka to Błażeja.[23]
April 25 – Line 2 of the Darmstadt tram network is extended from Hochschulstadion to TU-Lichtwiese.[24]
- April 29
– Line 1 of the Shaoxing Metro is extended from China Textile City to Fangquan.[25]
– Line 5 of the Fuzhou Metro opens.[26]
May
May 1 – Line 7 of the Guangzhou Metro is extended from Guangzhou South Railway Station to Meidi Dadao.[27]
Scheduled events
May
May 15 – Expected completion of East Rail line's extension across Victoria Harbour to Hong Kong Island.
May 20 – Expected opening of the Tempe Streetcar in Tempe, Arizona.[28]
May 24 – Expected opening of the central section of Crossrail, which together with TfL Rail will be officially branded the "Elizabeth Line". [29]
- May 28
– The Odense Letbane is scheduled to open.[30]
– The Seoul Metropolitan Subway Shinbundang Line extends from Gangnam station to Sinsa station, while the Sillim Line starts operation.
– PNR South Main Line extension scheduled partial completion, with an operating speed up to 160 km/h (99 mph).[31]
May 31 – Line 12 of the Paris Metro will be extended from Front Populaire to Mairie d’Aubervilliers.[32]
June
– Milan Metro Line 4 extension to Dateo.[33]
– Planned partial opening of MRT Putrajaya line, Malaysia's fifth metro line, from Sungai Buloh/Kwasa Damansara to Kampong Batu.[34]
– Earliest MRTA Pink Line opening.[35]
July
July 1 – SEPTA Regional Rail Media/Elwyn Line to be extended from Elwyn to Wawa.[36]
July 29 – Expected completion of Edmonton's Valley Line.[37]
– Greater Jakarta LRT opening.[38]
– The North Triangle Common Station is scheduled to be partially opened, after various delays in its construction due to disputes in its location.[39]
– Amtrak is scheduled to extend the Ethan Allen Express to Burlington, Vermont.[40]
– The Washington Metro Silver Line is projected to be extended to Ashburn via Washington Dulles International Airport.
August
– Expected start of passenger service through the Regional Connector in Los Angeles.[41]
– Several night trains in Brussels to be launched, at least Brussels-Malmo is approved.
September
– Toronto subway Line 1 Yonge–University is expected to introduce ATC at the full length of line (as of 2020, it is 70% completed).[42]
October
– The first phase of the North–South Commuter Railway is scheduled to partially open.[43]
– Planned opening of the Central Subway in San Francisco,[44] after repeated delays.[45]
November
November 1 – Tri-Rail Downtown Miami Link is expected to open.[46]
– Los Angeles County Metropolitan Transportation Authority's K Line expected to open after several delays.[47]
December
– Opening of the Limmatalerbahn, a LRT line connecting the Limmatvalley with Zurich as Line 20 in the network.
– Expected completion of Wendlingen–Ulm high-speed railway.[48]
– Opening of Agra Metro.[49]
– The first section of Milan Metro Line 4, between Forlanini FS and Linate Aeroporto, is scheduled to open.[50] The section will be disconnected from the rest of Milan Metro network.
– Milan Metro Line 4 extension to San Babila.[51][52]
– Scheduled opening of Metro Express (Mauritius) phase 2B.[53]
– Red and Blue lines of the Lagos Rail Mass Transit estimated opening.[54]
– The Follo Line is expected to open after delay.[55]
– Service begins along New York City's East Side Access, bringing Long Island Rail Road trains into Grand Central Terminal.[56]
Unknown date
– The Gawler railway line is expected to reopen as early as June 30 after the line is electrified, having been delayed from a November 2021 reopening due to the COVID-19 pandemic, and from an April 30 reopening due to the state election. Transport Minister Tom Koutsantonis has also stated that another delay might happen.[57][58]
– The first phase of the Réseau express métropolitain in Montreal is scheduled to open.[59]
– Opening of the Jinhua Rail Transit in Jinhua, China.[60][61]
– Opening of the first phase of the Fenghuang Maglev.[62]
– Paris Métro Line 4 automation (to increase capacity).
– Opening of Île-de-France tramway Line 13 Express.[63]
– RER E extension to Nanterre-La Folie.
– Rennes Metro line B opening.[64]
– Electrified tracks length claimed to reach 68,000 km (only 28,000 km were in 2019).[65]
– Indonesia's Jakarta–Bandung high-speed rail operation start.[66]
– Withdrawal of Tokyo Metro 02 series from Tokyo Metro Marunouchi Line.
– Hokuriku Shinkansen extension.
– Kyushu Shinkansen western isolated branch opening.
– Rotterdam Metro Line B extension to Hoek van Holland Strand.
– Warsaw Metro Line M2 to be extended west from Księcia Janusza to Bemowo, and east from Trocka to Bródno.[67]
– Expected completion of the electrification of line to Ivanovo city.
– Thomson–East Coast MRT line Stage 3 is scheduled to open.[68]
– Expected completion of the full Limmattal light rail line.[69]
– Khon Kaen Light Rail Transit opening.
– Blackpool Tramway extension to Blackpool North railway station begins operation.[70]
– Leeds to York electrification.
– East Midlands franchise to start operations of bi-mode trains.
– Wales to start tram-train operations.
– Sonoma–Marin Area Rail Transit service is expected to be extended north to Windsor station.[71]
– Arrow is expected to begin service in Redlands, California.[72]
– Honolulu Rail Transit is expected to open the line to Middle Street.[73]
– The Medford Branch of the Green Line Extension opens to Somerville and Medford, Massachusetts.[9]
Industry awards
North America
- Awards presented by Railway Age magazine
- 2022 Railroader of the Year: Keith Creel (CP) and Patrick J. Ottensmeyer (KCS)
References
- "Archived copy". Archived from the original on January 2, 2022. Retrieved January 18, 2022.
{{cite web}}
: CS1 maint: archived copy as title (link) - "杭台高铁将于1月8日开通运营两地最快63分钟可达--经济·科技--人民网". finance.people.com.cn. Retrieved May 5, 2022.
- "Grand Paris : la ligne 4 du métro arrivera à Bagneux, son nouveau terminus, le 13 janvier 2022". leparisien.fr (in French). December 7, 2021. Archived from the original on January 4, 2022. Retrieved January 10, 2022.
- "轨道交通9号线一期通车啦!从高滩岩到兴科大道全程58分钟".
- "Rabat-Sale tramway line 2 extension opens today Rabat sale tramway line". Hespress English. February 16, 2022. Retrieved February 16, 2022.
- "지하철 4호선 진접선 내일 개통…남양주 진접∼서울역 52분에 주파". Maeil Business Newspaper (in Korean). March 18, 2022. Retrieved March 20, 2022.
- "남양주에서 서울까지 52분…4호선 연장 진접선 개통". Maeil Business Newspaper (in Korean). March 18, 2022. Retrieved March 20, 2022.
- "Core section of Hungary–Serbia railway open for operations". RailFreight.com. March 24, 2022. Retrieved April 4, 2022.
- Dolven, Taylor (March 21, 2022). "Decades in the making, Green Line Extension to Somerville's Union Square finally opens for passengers". Boston Globe. Retrieved March 21, 2022.
- Panti, Llanesca T. (March 22, 2022). "Duterte announces free MRT-3 rides from March 28 to April 30 amid rehab work completion". GMA News. Retrieved April 12, 2022.
- "Россия откажется от строительства скоростной железной дороги между Москвой и Санкт-Петербургом". Экономическая правда (in Russian). March 25, 2022. Retrieved March 25, 2022.
- García, Josu (March 25, 2022). "El tranvía viaja ya entre Atxuri y Bolueta, su primera expansión desde hace 10 años". El Correo (in Spanish). Retrieved March 25, 2022.
- "Финляндия отменила пассажирские поезда в Россию". Экономическая правда (in Russian). March 25, 2022. Retrieved March 25, 2022.
- "Delhi: When changing stations means you have to get down in the middle of the metro track | Delhi News - Times of India". The Times of India. TNN. October 18, 2019. Retrieved April 9, 2021.
- Gandhiok, Jasjeev (March 30, 2022). "Station at Punjabi Bagh West to link Pink, Green Metro lines". Hindustan Times. Retrieved April 1, 2022.
- "China's first municipal loop-line express rail opens in Guiyang". english.guiyang.gov.cn. Retrieved May 5, 2022.
- "新快报带你直击广州地铁22号线开通首日_现场_新快网_新中产的移动资讯友伴". www.xkb.com.cn. March 31, 2022. Retrieved March 31, 2022.
- "В Краснодаре открыли движение трамваев по новой ветке на улице Московской". Кубань24 (in Russian). March 31, 2022.
- "4月1日,杭州地铁7号线江北段、9号线南段开通". www.hzmetro.com (in Chinese (China)). Retrieved April 6, 2022.
- "ScotRail franchise to end in 2022". Railway Gazette International. December 19, 2019. Archived from the original on December 25, 2019. Retrieved February 16, 2021.
- "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. April 4, 2022. Retrieved April 6, 2022.
- "Nová tramvajová trať: Sídliště Barrandov – Holyně". Dopravní podnik hl. m. Prahy, akciová společnost (in Czech). April 4, 2022. Retrieved April 27, 2022.
- "Poznań: Próbne tramwaje dotarły do Błażeja na Naramowicach". www.transport-publiczny.pl (in Polish). March 11, 2022. Retrieved April 27, 2022.
- "Lichtwiesenbahn feierlich in Betrieb genommen". TU Darmstadt (in German). April 25, 2022. Retrieved April 27, 2022.
- "绍兴地铁1号线主线明日开通" (in Chinese (China)). April 28, 2022.
- "福州地铁5号线29日通车 同步推出地铁公交联票等优惠" (in Chinese (China)). April 28, 2022.
- "【官宣来了!#七号线西延段5月1日开门迎客#】". weibo.com (in Chinese (China)). April 30, 2022. Retrieved April 30, 2022.
- Stone, Kevin (April 29, 2022). "Ride on: May date set for debut of Tempe Streetcar service". KTAR. Retrieved May 2, 2022.
- "Crossrail: Elizabeth line due to open on 24 May". BBC. Retrieved May 4, 2022.
- "Odense Letbane åbner lørdag den 28. maj". www.odenseletbane.dk. Retrieved April 30, 2022.
- San Juan, Alexandria Dennise (September 27, 2021). "PNR Bicol eyed for partial operations by April 2022 — Tugade". Manila Bulletin. Archived from the original on January 5, 2022. Retrieved January 5, 2022.
- "Prolongement de la ligne 12 du métro : ouverture de deux nouvelles stations le 31 mai". www.sortiraparis.com (in French). Retrieved May 4, 2022.
- ANASTASIO, GIAMBATTISTA (June 2, 2018). "M4, inaugurazione a luglio 2023. Ritardo di 15 mesi rispetto alle previsioni - Il Giorno". Il Giorno (in Italian). Archived from the original on November 16, 2020. Retrieved October 29, 2018.
- "Second phase of Putrajaya MRT on track for 2023 opening". Free Malaysia Today | FMT. October 4, 2021. Archived from the original on October 4, 2021. Retrieved November 19, 2021.
- Transport Daily news Archived January 30, 2022, at the Wayback Machine, 22 July 2021
- "Service Restoration Update – January 2022" (PDF). Middletown Township. Southeastern Pennsylvania Transportation Authority. Retrieved April 25, 2022.
- "DBRS Morningstar Comments on TransEd Partners General Partnership's Delay in Service Commencement". www.dbrsmorningstar.com. December 22, 2021. Archived from the original on December 28, 2021. Retrieved December 28, 2021.
- "Proyek LRT Jabodebek Molor ke 2022". Detik.com. June 5, 2020.
- "DOTr eyes closure of EDSA-North Avenue to facilitate Grand Central Station completion". GMA News. December 8, 2021. Archived from the original on December 8, 2021. Retrieved December 9, 2021.
- St. Angelo, Lilly (October 21, 2021). "Watch for trains: Amtrak's route to Burlington is doing practice runs". Burlington Free Press. Retrieved October 23, 2021.
- Nelson, Laura J. (May 12, 2019). "L.A. Metro's downtown subway project may not open until mid-2022". Los Angeles Times. Archived from the original on April 14, 2021. Retrieved May 15, 2019.
- "Archived copy". Archived from the original on February 14, 2021. Retrieved April 1, 2021.
{{cite web}}
: CS1 maint: archived copy as title (link) - Gines Jr., Ben (December 2, 2021). "PNR phase 1 on track for 2022 completion". The Manila Times. Archived from the original on December 2, 2021. Retrieved January 5, 2022.
- Chun, Stephen (December 23, 2021). "Central Subway Revenue Service Update". San Francisco Municipal Transportation Agency. Retrieved December 28, 2021.
- Hoe, Albert. "Central Subway Monthly Progress Report (May 2019)" (PDF). SFMTA. Municipal Transportation Agency. Archived (PDF) from the original on June 27, 2019. Retrieved June 27, 2019.
- Stoikow, Gabriela Henriquez (March 29, 2022). "Tri-Rail plans arrival in downtown Miami by Nov. 1". Miami Today. Retrieved April 13, 2022.
- Fine, Howard (June 7, 2021). "Opening Date Pushed Back Again for Metro's Crenshaw-LAX Line". Los Angeles Business Journal. Archived from the original on June 28, 2021. Retrieved June 28, 2021.
- "Angebot auf der Filstalbahn soll weiterentwickelt werden" (in German). Baden–Württemberg state government. April 17, 2020. Archived from the original on August 1, 2020. Retrieved June 20, 2020.
- "'Agra metro will start operating by Dec 2022' | Agra News - Times of India". The Times of India. November 1, 2020. Archived from the original on December 21, 2020. Retrieved November 24, 2020.
- Andrea Senesi (July 29, 2021). "Metrò 4, la mini apertura rinviata a dicembre 2022: «Passeggeri ridotti, non è redditizio»". Corriere.it (in Italian). Archived from the original on July 29, 2021. Retrieved July 29, 2021.
- ANASTASIO, GIAMBATTISTA (June 2, 2018). "M4, inaugurazione a luglio 2023. Ritardo di 15 mesi rispetto alle previsioni - Il Giorno". Il Giorno (in Italian). Archived from the original on November 16, 2020. Retrieved October 29, 2018.
- "Milano, metrò M4: slitta al 2024 l'apertura della tratta San Babila-San Cristoforo". Corriere della Sera (in Italian). March 23, 2021. Archived from the original on May 21, 2021. Retrieved May 21, 2021.
- "Das Mootanah (Metro Express): the acquisition of land from Rose-Hill to Ebony has already started – archyworldys". Mauritius Newspapers. July 14, 2021. Archived from the original on July 14, 2021. Retrieved July 14, 2021.
- Olisah, Chike (February 25, 2021). "Lagos says blue, red rail lines will be ready by December 2022". Nairametrics. Archived from the original on June 14, 2021. Retrieved March 12, 2021.
- "Follobanen - Bane NOR". www.banenor.no. Archived from the original on July 25, 2021. Retrieved June 18, 2021.
- "Long Island Committee Meeting December 2015" (PDF). mta.info. Metropolitan Transportation Authority. December 14, 2015. Archived from the original (PDF) on February 25, 2016. Retrieved February 17, 2016.
- "Another Gawler Line blow-out with city train network to close for Adelaide Fringe opening". January 24, 2022. Archived from the original on January 24, 2022. Retrieved January 24, 2022.
- "Free substitute buses on Adelaide's Gawler train line as delays to electrification work revealed". April 2, 2022. Retrieved April 2, 2022.
- "COVID-19 and the safety of the Mount Royal Tunnel: what to know about the updated REM schedule in relation to the exceptional events of 2020". Réseau express métropolitain. November 11, 2020. Archived from the original on November 27, 2020. Retrieved November 11, 2020.
- "轨道金义线车站全线进入装修". March 4, 2021. Archived from the original on September 17, 2021. Retrieved December 30, 2021.
- "金义东市域轨道交通项目今日开工". 金华新闻网. December 27, 2016. Archived from the original on December 1, 2017. Retrieved November 11, 2017.
- "Fenghuang Maglev Line to Open to Traffic by the End of This Year". April 30, 2021. Archived from the original on December 4, 2021.
- "Découvrir le projet - tram T13 Nouvelle ligne Saint-Cyr > Saint-Germain". Tram T13 - Saint-Cyr - Saint-Germain (in French). Retrieved May 5, 2022.
- Duroux, Solenne (April 10, 2021). "Stations terminées mais rames retardées : la seconde ligne du métro de Rennes patine" (in French). le Parisien. Archived from the original on May 7, 2021. Retrieved June 1, 2021.
- "Railways to implement Rs 18,000-crore project to run trains at 160 kmph". India Today. October 22, 2019. Archived from the original on November 27, 2019. Retrieved February 16, 2021.
- Fardi Bestari (April 13, 2021). "Progres pembangunan proyek kereta cepat Jakarta-Bandung". Tempo (in Indonesian). Archived from the original on August 4, 2021. Retrieved August 4, 2021.
- "Postępy na budowie wschodniego i zachodniego odcinka II linii metra". Urząd Miasta Stołecznego Warszawy (in Polish). February 26, 2021. Retrieved March 6, 2022.
- "Archived copy" (PDF). Archived (PDF) from the original on July 17, 2021. Retrieved May 27, 2021.
{{cite web}}
: CS1 maint: archived copy as title (link) - Green, Anitra (September 2, 2020). "First stage of Limmattal LRT line opens in Zürich". International Railway Journal. Archived from the original on September 9, 2019. Retrieved November 18, 2020.
- "'Significant progress' made on Blackpool town centre investment plans". Blackpool Gazette. February 27, 2019. Archived from the original on October 12, 2019. Retrieved August 5, 2021.
- Fixler, Kevin (February 4, 2021). "SMART delays completion of $65 million Windsor extension to 2022". North Bay Business Journal. The Press Democrat. Archived from the original on February 11, 2021. Retrieved February 10, 2021.
- "Construction begins for rail connecting Redlands to San Bernardino". Redlands Daily Facts. July 19, 2019. Archived from the original on January 30, 2022. Retrieved September 12, 2019.